PLAN REV 1.2MILESTONES 14COMPONENTS 26UPDATED 2026-11-17LICENSE CC BY-SA 4.0
Everything the base needs

Product breakdown and coverage

Every system and component the plan has identified, which milestone delivers it, whether Open Moon builds, buys or partners for it, and how far its design has got. This page is the honest to-do list.

27 of 86 components have a detailed design page. The rest are named in a milestone but not yet broken down into sub-components, parts and a bill of materials.

Components identified86in 14 systems
Design pages27sub-components, risks, sources
Not yet designed59open for contributors
Bills of materials0next revision

TL · Transport and logistics

IDComponentMilestoneApproachDesign status
TL.1 Small cargo delivery service (<1 t) M02 buy not yet designed
TL.2 Medium cargo delivery service (~3 t) M02 buy not yet designed
TL.3 Heavy cargo delivery service (~15 t) M02 buy not yet designed
TL.4 Crew transport (launch M02 partner not yet designed
TL.5 Common payload interface M02 build C02.1 · TRL 6
TL.6 Offloading crane M02 build C02.2 · TRL 4
TL.7 Cargo containers and inventory tracking M09 build not yet designed
TL.8 Spares strategy and on-site stores M09 build not yet designed
TL.9 Lander refuelling interface M11 build C11.1 · TRL 4

CN · Communications, navigation and data

IDComponentMilestoneApproachDesign status
CN.1 Lunar relay services M03 buy not yet designed
CN.2 Base communications node M03 build C03.1 · TRL 6
CN.3 Crater-rim relay masts M03 build C03.2 · TRL 5
CN.4 Surface navigation beacons and PNT M03 build not yet designed
CN.5 Base timing reference M03 build not yet designed
CN.6 Ground stations and mission control centre M03 build not yet designed
CN.7 Base data network M03 build not yet designed
CN.8 Cybersecurity M03 build not yet designed
CN.9 Flight and surface software framework M03 build not yet designed

PW · Power

IDComponentMilestoneApproachDesign status
PW.1 Fission surface power unit M04 partner C04.1 · TRL 4
PW.2 Vertical solar towers M04 buy C04.2 · TRL 5
PW.3 Energy storage (fuel cells M04 build C04.3 · TRL 5
PW.4 HVDC grid and cable-laying rover M04 build C04.4 · TRL 4
PW.5 Mobile power cart for PSR work M06 build not yet designed
PW.6 Habitat power distribution and emergency power M08 build not yet designed
PW.7 Lunar-made solar array line M12 build not yet designed

SC · Site and construction

IDComponentMilestoneApproachDesign status
SC.1 Excavator M05 build C05.1 · TRL 5
SC.2 Hardened landing pad M05 build C05.2 · TRL 4
SC.3 Regolith sintering robot M05 build C05.3 · TRL 4
SC.4 Roads M05 build not yet designed
SC.5 Site lighting and markers M05 build not yet designed
SC.6 Outdoor dust mitigation M05 build not yet designed
SC.7 Geotechnical survey kit M01 build not yet designed

IS · Resource production (ISRU)

IDComponentMilestoneApproachDesign status
IS.1 Oxygen-from-regolith plant M06 build C06.1 · TRL 4
IS.2 Ice mining and water extraction M06 build C06.2 · TRL 4
IS.3 Cryogenic and water storage M06 build C06.3 · TRL 5
IS.4 Regolith beneficiation (sorting M06 build not yet designed
IS.5 Water electrolysis plant M06 build not yet designed
IS.6 Volatiles and nitrogen recovery M11 build not yet designed
IS.7 Surface propellant depot M11 build C11.1 · TRL 4

MR · Mobility and robotics

IDComponentMilestoneApproachDesign status
MR.1 Prospector rover M01 build C01.1 · TRL 6
MR.2 Lunar Terrain Vehicle service M07 buy not yet designed
MR.3 Pressurised rover M07 partner not yet designed
MR.4 Utility carts and inspection robots M07 build C07.1 · TRL 5
MR.5 Robotic manipulators and tool changers M07 build not yet designed
MR.6 Teleoperation centre and autonomy software M07 build not yet designed
MR.7 Robot maintenance shelter M07 build not yet designed

HB · Habitation

IDComponentMilestoneApproachDesign status
HB.1 Habitat module M08 partner C08.1 · TRL 5
HB.2 Dust lock and suitports M08 build C08.3 · TRL 5
HB.3 Inter-module nodes and connectors M09 build not yet designed
HB.4 Habitat thermal control M08 build not yet designed
HB.5 Interior outfitting (quarters M08 build not yet designed
HB.6 Regolith radiation shielding M09 build C09.1 · TRL 4
HB.7 Storm shelter M09 build C09.2 · TRL 6

LS · Life support

IDComponentMilestoneApproachDesign status
LS.1 Life support system (ECLSS) M08 build C08.2 · TRL 7
LS.2 Atmosphere make-up (nitrogen M09 build not yet designed
LS.3 Fire detection and suppression M08 build not yet designed
LS.4 Solid waste and hygiene processing M09 build not yet designed
LS.5 Potable water storage and quality monitoring M08 build not yet designed

CH · Crew systems and health

IDComponentMilestoneApproachDesign status
CH.1 EVA system (suits and tools) M08 partner C08.4 · TRL 6
CH.2 Medical bay M09 build C09.3 · TRL 6
CH.3 Exercise and countermeasures M09 build not yet designed
CH.4 Radiation dosimetry and space weather warning M09 build not yet designed
CH.5 Stored food system M08 buy not yet designed
CH.6 Crew selection M08 build not yet designed

FP · Food production

IDComponentMilestoneApproachDesign status
FP.1 Greenhouse module M10 build C10.1 · TRL 5
FP.2 Nutrient recovery and composting M10 build not yet designed
FP.3 Food processing kitchen M10 build not yet designed
FP.4 Seed bank and crop research M10 build not yet designed

MF · Manufacturing

IDComponentMilestoneApproachDesign status
MF.1 Fabrication shop M12 build C12.1 · TRL 5
MF.2 Metal extraction and refining M12 build not yet designed
MF.3 Glass and ceramics production M12 build not yet designed
MF.4 Electronics repair bench M12 build not yet designed

SR · Science and survey

IDComponentMilestoneApproachDesign status
SR.1 Open site-selection GIS and data set M00 build not yet designed
SR.2 Illumination and thermal modelling toolkit M00 build not yet designed
SR.3 Environmental monitoring station M01 build not yet designed
SR.4 Seismic network M09 build not yet designed

PG · Programme, safety and ground

IDComponentMilestoneApproachDesign status
PG.1 Programme management and systems engineering M00 build not yet designed
PG.2 Safety and mission assurance M00 build not yet designed
PG.3 Legal M00 build not yet designed
PG.4 Ground test facilities and analogs M00 build not yet designed
PG.5 Open-source community and governance M00 build not yet designed
PG.6 Planetary protection and environmental stewardship M00 build not yet designed

CL · Colony

IDComponentMilestoneApproachDesign status
CL.1 Locally built habitat expansion M13 build not yet designed
CL.2 Colony governance framework M13 build not yet designed
CL.3 Propellant and services market M13 build not yet designed
CL.4 Emergency evacuation and rescue M13 build not yet designed

What a complete plan still needs

Beyond the missing component pages, a full engineering plan at early-design level needs these system-level documents. None exist yet:

  • Requirements, each numbered and traced from the mission objective down to each component.
  • Concept of operations, describing a day, a lunar night and an emergency at the base.
  • Base-wide budgets for mass, power and heat.
  • Launch manifest, listing which hardware flies on which lander, and when.
  • Integrated schedule with the critical path.
  • Interface control documents between systems.
  • Bills of materials for every component.
  • Risk register scored by likelihood and consequence.
  • Trade studies, for example fission vs solar-only, or molten electrolysis vs carbothermal.
  • Verification matrix, showing how each requirement is proven.