Everything the base needs
Product breakdown and coverage
Every system and component the plan has identified, which milestone delivers it, whether Open Moon builds, buys or partners for it, and how far its design has got. This page is the honest to-do list.
27 of 86 components have a detailed design page. The rest are named in a milestone but not yet broken down into sub-components, parts and a bill of materials.
Components identified86in 14 systems
Design pages27sub-components, risks, sources
Not yet designed59open for contributors
Bills of materials0next revision
TL · Transport and logistics
| ID | Component | Milestone | Approach | Design status |
| TL.1 |
Small cargo delivery service (<1 t) |
M02 |
buy |
not yet designed |
| TL.2 |
Medium cargo delivery service (~3 t) |
M02 |
buy |
not yet designed |
| TL.3 |
Heavy cargo delivery service (~15 t) |
M02 |
buy |
not yet designed |
| TL.4 |
Crew transport (launch |
M02 |
partner |
not yet designed |
| TL.5 |
Common payload interface |
M02 |
build |
C02.1 · TRL 6 |
| TL.6 |
Offloading crane |
M02 |
build |
C02.2 · TRL 4 |
| TL.7 |
Cargo containers and inventory tracking |
M09 |
build |
not yet designed |
| TL.8 |
Spares strategy and on-site stores |
M09 |
build |
not yet designed |
| TL.9 |
Lander refuelling interface |
M11 |
build |
C11.1 · TRL 4 |
CN · Communications, navigation and data
| ID | Component | Milestone | Approach | Design status |
| CN.1 |
Lunar relay services |
M03 |
buy |
not yet designed |
| CN.2 |
Base communications node |
M03 |
build |
C03.1 · TRL 6 |
| CN.3 |
Crater-rim relay masts |
M03 |
build |
C03.2 · TRL 5 |
| CN.4 |
Surface navigation beacons and PNT |
M03 |
build |
not yet designed |
| CN.5 |
Base timing reference |
M03 |
build |
not yet designed |
| CN.6 |
Ground stations and mission control centre |
M03 |
build |
not yet designed |
| CN.7 |
Base data network |
M03 |
build |
not yet designed |
| CN.8 |
Cybersecurity |
M03 |
build |
not yet designed |
| CN.9 |
Flight and surface software framework |
M03 |
build |
not yet designed |
PW · Power
SC · Site and construction
| ID | Component | Milestone | Approach | Design status |
| SC.1 |
Excavator |
M05 |
build |
C05.1 · TRL 5 |
| SC.2 |
Hardened landing pad |
M05 |
build |
C05.2 · TRL 4 |
| SC.3 |
Regolith sintering robot |
M05 |
build |
C05.3 · TRL 4 |
| SC.4 |
Roads |
M05 |
build |
not yet designed |
| SC.5 |
Site lighting and markers |
M05 |
build |
not yet designed |
| SC.6 |
Outdoor dust mitigation |
M05 |
build |
not yet designed |
| SC.7 |
Geotechnical survey kit |
M01 |
build |
not yet designed |
IS · Resource production (ISRU)
MR · Mobility and robotics
| ID | Component | Milestone | Approach | Design status |
| MR.1 |
Prospector rover |
M01 |
build |
C01.1 · TRL 6 |
| MR.2 |
Lunar Terrain Vehicle service |
M07 |
buy |
not yet designed |
| MR.3 |
Pressurised rover |
M07 |
partner |
not yet designed |
| MR.4 |
Utility carts and inspection robots |
M07 |
build |
C07.1 · TRL 5 |
| MR.5 |
Robotic manipulators and tool changers |
M07 |
build |
not yet designed |
| MR.6 |
Teleoperation centre and autonomy software |
M07 |
build |
not yet designed |
| MR.7 |
Robot maintenance shelter |
M07 |
build |
not yet designed |
HB · Habitation
LS · Life support
| ID | Component | Milestone | Approach | Design status |
| LS.1 |
Life support system (ECLSS) |
M08 |
build |
C08.2 · TRL 7 |
| LS.2 |
Atmosphere make-up (nitrogen |
M09 |
build |
not yet designed |
| LS.3 |
Fire detection and suppression |
M08 |
build |
not yet designed |
| LS.4 |
Solid waste and hygiene processing |
M09 |
build |
not yet designed |
| LS.5 |
Potable water storage and quality monitoring |
M08 |
build |
not yet designed |
CH · Crew systems and health
| ID | Component | Milestone | Approach | Design status |
| CH.1 |
EVA system (suits and tools) |
M08 |
partner |
C08.4 · TRL 6 |
| CH.2 |
Medical bay |
M09 |
build |
C09.3 · TRL 6 |
| CH.3 |
Exercise and countermeasures |
M09 |
build |
not yet designed |
| CH.4 |
Radiation dosimetry and space weather warning |
M09 |
build |
not yet designed |
| CH.5 |
Stored food system |
M08 |
buy |
not yet designed |
| CH.6 |
Crew selection |
M08 |
build |
not yet designed |
FP · Food production
| ID | Component | Milestone | Approach | Design status |
| FP.1 |
Greenhouse module |
M10 |
build |
C10.1 · TRL 5 |
| FP.2 |
Nutrient recovery and composting |
M10 |
build |
not yet designed |
| FP.3 |
Food processing kitchen |
M10 |
build |
not yet designed |
| FP.4 |
Seed bank and crop research |
M10 |
build |
not yet designed |
MF · Manufacturing
| ID | Component | Milestone | Approach | Design status |
| MF.1 |
Fabrication shop |
M12 |
build |
C12.1 · TRL 5 |
| MF.2 |
Metal extraction and refining |
M12 |
build |
not yet designed |
| MF.3 |
Glass and ceramics production |
M12 |
build |
not yet designed |
| MF.4 |
Electronics repair bench |
M12 |
build |
not yet designed |
SR · Science and survey
| ID | Component | Milestone | Approach | Design status |
| SR.1 |
Open site-selection GIS and data set |
M00 |
build |
not yet designed |
| SR.2 |
Illumination and thermal modelling toolkit |
M00 |
build |
not yet designed |
| SR.3 |
Environmental monitoring station |
M01 |
build |
not yet designed |
| SR.4 |
Seismic network |
M09 |
build |
not yet designed |
PG · Programme, safety and ground
| ID | Component | Milestone | Approach | Design status |
| PG.1 |
Programme management and systems engineering |
M00 |
build |
not yet designed |
| PG.2 |
Safety and mission assurance |
M00 |
build |
not yet designed |
| PG.3 |
Legal |
M00 |
build |
not yet designed |
| PG.4 |
Ground test facilities and analogs |
M00 |
build |
not yet designed |
| PG.5 |
Open-source community and governance |
M00 |
build |
not yet designed |
| PG.6 |
Planetary protection and environmental stewardship |
M00 |
build |
not yet designed |
CL · Colony
| ID | Component | Milestone | Approach | Design status |
| CL.1 |
Locally built habitat expansion |
M13 |
build |
not yet designed |
| CL.2 |
Colony governance framework |
M13 |
build |
not yet designed |
| CL.3 |
Propellant and services market |
M13 |
build |
not yet designed |
| CL.4 |
Emergency evacuation and rescue |
M13 |
build |
not yet designed |
What a complete plan still needs
Beyond the missing component pages, a full engineering plan at early-design level needs these system-level documents. None exist yet:
- Requirements, each numbered and traced from the mission objective down to each component.
- Concept of operations, describing a day, a lunar night and an emergency at the base.
- Base-wide budgets for mass, power and heat.
- Launch manifest, listing which hardware flies on which lander, and when.
- Integrated schedule with the critical path.
- Interface control documents between systems.
- Bills of materials for every component.
- Risk register scored by likelihood and consequence.
- Trade studies, for example fission vs solar-only, or molten electrolysis vs carbothermal.
- Verification matrix, showing how each requirement is proven.