Solar particle event storm shelter
Water-wall enclosure
Fixed water tanks form the walls and ceiling of a small room. They double as the base's reserve water store.
- Modular water bladders in rigid frames (10 cm)
- Level sensors on each bladder
- Fill and drain manifold to the water loop
- Hinged water-filled door panel
Reconfigurable shielding
Stowage, food and extra water bags are moved onto marked rails to add another 10 cm when a large event starts.
- Rail-mounted bag holders
- Pre-packed water bags
- Shielding map showing where dense bags go
- Bag inventory tags
Air and power tie-in
The shelter shares the habitat atmosphere through a bent, shielded duct and has its own backup lighting and sensors.
- Ventilation duct with dog-leg
- CO₂ and O₂ sensors
- Battery-backed lights and fans
- Backup CO₂ absorbent canisters
Warning chain
Forecasts from Earth give advance notice. Local detectors give the final alarm without needing Earth.
- NOAA SWPC forecasts and S-scale warnings
- NASA SRAG console support
- HERA-class area monitors with base alarm
- Crew Active Dosimeters with dose-rate alarm
- EVA recall procedure
Shelter supplies
Enough food, water, hygiene and medical items for a three-day stay are pre-packed inside.
- Food and drinking water for 8 crew × 3 days
- Waste bags and hygiene kit
- Medical kit
- Sleeping restraints and pads
- Comms and laptop terminal
What it does
Solar particle events (SPEs) are bursts of low- to medium-energy protons. They are rare, but an unshielded crew could get acute radiation sickness12. NASA-STD-3001 says crews must be kept below 250 mSv for the design event, which is the sum of the October 1989 events1. The storm shelter is where the crew go to meet that limit.
Once the habitat is under ≥2 m of regolith (C09.1), the shelter becomes a backup. It matters most in three cases: before the cover is finished, at the less-shielded entrance end, and when crew are recalled from EVA.
How it works
How thick. NASA’s guidance is to add 10 cm of water to the crew quarters for a once-a-century event, and about 20 cm for a once-a-millennium event. This can be done partly by moving water containers and stowage, and SPE timelines leave time to do it. About 95% of SPEs need only “as low as reasonably achievable” (ALARA) steps, not a shelter1.
Water walls and stowage. NASA studies show that food, water and supplies can be rearranged into a shelter, and that water walls can add to crew-quarters shielding2. In one study of a four-person, ISS-derived habitat, the planned supplies were only enough to shield two crew quarters (with crew doubling up) or a central box half the size first proposed2. That is why Open Moon builds the first 10 cm in as permanent tanks. Orion’s plan uses stowage bags in the same way4.
Location. The shelter is in the centre module, under the deepest regolith. NASA describes a hub-and-spoke layout, with stores and equipment around a central core where the crew spend most of their time1.
Warning chain.
- NOAA’s Space Weather Prediction Center watches proton flux with GOES satellites. It issues warnings when an S1 or larger storm is expected, and alerts when each level is reached3.
- NASA’s Space Radiation Analysis Group at Johnson checks the SWPC forecast daily and alerts mission control4.
- On site, HERA monitors can warn crew to take shelter. Crew Active Dosimeters log each person’s dose in real time5.
Fast protons can arrive within tens of minutes of an eruption. A storm lasts hours to days3. Long-range prediction is not accurate. But real-time dose-rate readings are enough to keep exposure well below the limits1. For EVA, real-time alerts protect crew well if they can get to shielding within 2 hours1.
Sizing (ESTIMATE)
| Item | Working |
|---|---|
| Shielded faces | Walls + ceiling of a 2 × 3 × 2 m room = 26 m² (the floor faces the Moon) |
| Fixed water, 10 cm | 26 m² × 0.10 m ≈ 2.6 m³ ≈ 2.6 t |
| Reconfigurable, +10 cm | another ≈ 2.6 t of water bags and stowage |
| Drinking water, 8 crew × 3 days | 8 × 3 × 3.217 kg6 ≈ 77 kg |
| Food, 8 crew × 3 days | 8 × 3 × 2.36 kg packaged7 ≈ 57 kg |
The fixed 2.6 t is several times a 60-day drinking-water reserve for four crew (4 × 60 × 3.217 kg ≈ 0.8 t). So the shelter walls can also serve as the base’s water store.
Testing and qualification
- Model the shelter inside the buried habitat with OLTARIS, using the October 1989 design event2.
- Build a ground mock-up and time crews building the reconfigurable layer.
- Test bladder leaks, the duct, and CO₂ build-up with 8 people for 72 hours.
- On the Moon, fill the walls and compare HERA readings inside and outside during quiet-Sun conditions.
- Run a shelter drill every crew rotation, including an EVA recall.
Open questions
- What dose do the entrance tunnel and airlock really get while the cover is being built?
- How far can EVAs and rovers go while keeping a 2-hour return to shielding?
- Can wastewater or brine fill the walls instead of clean water?
- What should the dose-rate thresholds be for the lunar surface?
| Severity | Problem | Solution |
|---|---|---|
| Critical | A large event hits crew on EVA far from the habitat | Limit EVA range so crew can reach shielding within 2 hours; pressurised rovers carry water shielding; recall on the first alarm. |
| High | Solar particle events cannot be predicted accurately | Rely on real-time dose rates and local alarms; keep the shelter minutes away from every work area. |
| High | Water drawn from the walls for life support leaves the shelter thin | Flight rule for a minimum fill; level alarms on every bladder; refill from M06 water. |
| High | Before burial is complete (C09.1) the shelter is the only real protection | Install and fill the shelter first; no crew stays beyond sortie length until it passes its dose check. |
| Medium | Loss of the Earth link breaks the forecast part of the warning chain | Local HERA monitors raise the alarm on their own; crew act on local readings. |
| Medium | Several days in a cramped room strains crew and air quality | Size for 8 crew; monitor CO₂; run regular drills; once fully buried, shelter stays should be short. |
| Medium | Frequent minor alerts disrupt work | Set action thresholds by dose rate; most events need only ALARA steps, not shelter. |
Specification
| Design event | Sum of the October 1989 solar particle events (NASA-STD-3001 design reference) |
| Dose limit | <250 mSv effective per event (NASA-STD-3001) |
| Added shielding | 10 cm water fixed + 10 cm reconfigurable = 20 cm (millennial event) |
| Capacity | 8 crew for up to 3 days (plan design choice) |
| Interior | ~2 m × 3 m × 2 m, ~12 m³ (ESTIMATE) |
| Water in walls | ~2.6 t fixed + ~2.6 t reconfigurable (ESTIMATE) |
| Location | Centre habitat module, under the 3 m roof cover (C09.1) |
| Time to enter | <15 minutes from anywhere inside the habitat (plan design choice) |
| Warning sources | NOAA SWPC and NASA SRAG forecasts; local HERA alarm; personal dosimeters |
Sources
- NASA OCHMO-TB-020: Design for ionizing radiation protection (NASA-STD-3001 technical brief) (Dec 2022)
- Clowdsley, NASA LaRC: Protecting astronauts from space radiation on the lunar surface (LSIC talk) (Feb 2021)
- NOAA SWPC: Solar radiation storm (accessed Nov 2026)
- NASA Science: How NASA will protect astronauts from space radiation at the Moon (Aug 2019)
- NASA: Artemis I radiation measurements validate Orion safety for astronauts (Oct 2024)
- NASA BVAD Rev2 (NASA/TP-2015-218570): crew consumables (Feb 2022)
- NASA NTRS 20230013896: Logistics rates beyond LEO (2.36 kg packaged food per crew-day) (2023)