The plan
| ID | Milestone | Phase | Window | Cost (est.) | Lowest TRL | Depends on |
|---|---|---|---|---|---|---|
| M00 | Programme set-up and site selection Pick the base site, and a backup, using data already returned by lunar orbiters, before anything is built for it. | 0 | 2026–2027 | $0.05–0.15B | 9 | |
| M01 | Robotic prospecting and ground truth Land robots at the chosen site to confirm, on the ground, how much ice is there, how deep, and what the soil is really like. | 0 | 2027–2029 | $0.5–1.2B | 6 | M00 |
| M02 | Transport to the surface Secure reliable rides for cargo of every size and for crews. Open Moon buys transport; it does not build rockets. | 1 | 2027–2031 | $0.95–2.2B | 6 | M00 |
| M03 | Communications, navigation and time Give the base an always-on link to Earth, a local network on the surface, and positioning and timing, mostly by buying services from relay networks already being built. | 1 | 2027–2031 | $0.72–1.94B | 6 | M00, M02 |
| M04 | Surface power grid Build a hybrid power grid of tall solar towers on the sunlit ridges, a fission reactor for darkness, energy storage and high-voltage cables, sized to run the oxygen plant and the first habitat. | 1 | 2028–2032 | $8.6–22.5B | 5 | M00, M02, M03 |
| M05 | Site preparation, landing pads and roads Robots build hardened landing pads, roads and protective berms so landers stop sandblasting the base and rovers can drive safely between sites. | 1 | 2028–2032 | $2.88–7.3B | 5 | M01, M02, M04 |
| M06 | Oxygen and water pilot plants Make the first oxygen from rock and the first water from polar ice at pilot scale, proving the processes that every later milestone depends on. | 1 | 2029–2033 | $3.8–9.8B | 4 | M01, M04, M05 |
| M07 | Surface mobility Get unpressurised rovers, a pressurised rover and utility robots working on the surface, so crews and cargo can move between every site. | 2 | 2028–2033 | $1.2–3.3B | 6 | M02, M03, M05 |
| M08 | First habitat and crewed sorties Land the first surface habitat and fly crews for stays of two to four weeks, leaving more infrastructure behind on every visit. | 2 | 2031–2035 | $10.6–30.2B | 5 | M02, M03, M04, M05, M07 |
| M09 | Permanent crew presence Move from visits to a crew that never leaves, with habitats buried under regolith for radiation protection, life support that recycles most air and water, and steady six-month rotations. | 3 | 2034–2038 | $26.9–88.6B | 5 | M04, M06, M08 |
| M10 | Growing food Grow a growing share of the crew's food in buried, LED-lit greenhouses, starting with fresh vegetables and working toward most calories. | 4 | 2035–2041 | $6.35–21.35B | 5 | M04, M06, M09 |
| M11 | Propellant and industrial-scale ISRU Scale the pilot plants up to hundreds of tonnes of oxygen and water a year, so landers can refuel on the Moon and the base pays its way. | 4 | 2036–2042 | $14.0–42.0B | 5 | M04, M05, M06 |
| M12 | Manufacturing and construction from regolith Make metals, glass, solar cells, building blocks and spare parts on the Moon, so new structures and repairs need little from Earth. | 4 | 2037–2044 | $5.5–16.0B | 4 | M05, M06, M11 |
| M13 | Self-sustaining colony Grow the base into a colony of 50–100 people that makes most of what it uses, with Earth supplying only electronics, medicines, specialist parts and people. | 5 | 2040–2050 | $40.0–120.0B | 4 | M09, M10, M11, M12 |
Phases
Phase 0 · Foundations
Choose the site with data already in hand from lunar orbiters, ground-truth it with robotic prospectors, and lock the transport contracts. Nothing lands that the base depends on until the site is confirmed.
Phase 1 · Robotic outpost
Before any crew arrives, robots and cargo landers put down power, communications, landing pads and the first oxygen and water pilot plants. The outpost has to survive several lunar nights unattended.
Phase 2 · Crewed sorties
Crews visit for weeks at a time, living in the first surface habitat and using unpressurised and pressurised rovers. Each visit leaves more infrastructure behind.
Phase 3 · Permanent base
Continuous crew presence. Habitats are buried under regolith for radiation protection, life support recycles most water and air, and resupply drops to a steady cadence.
Phase 4 · Industrial base
The base starts making what it consumes, including oxygen and propellant, building materials, spare parts and food, so each crew member needs less from Earth every year.
Phase 5 · Self-sustaining colony
The base grows into a colony that produces most of its own mass needs, measured as the share of consumables and construction mass made on the Moon, with Earth supplying only high-tech parts and people.