PLAN REV 1.2MILESTONES 14COMPONENTS 26UPDATED 2026-11-17LICENSE CC BY-SA 4.0
Master schedule

The plan

Every milestone in order. Each has exit criteria, workstreams, technology, costs, failure modes and sources.
IDMilestonePhaseWindowCost (est.)Lowest TRLDepends on
M00Programme set-up and site selection
Pick the base site, and a backup, using data already returned by lunar orbiters, before anything is built for it.
02026–2027$0.05–0.15B 9
M01Robotic prospecting and ground truth
Land robots at the chosen site to confirm, on the ground, how much ice is there, how deep, and what the soil is really like.
02027–2029$0.5–1.2B 6 M00
M02Transport to the surface
Secure reliable rides for cargo of every size and for crews. Open Moon buys transport; it does not build rockets.
12027–2031$0.95–2.2B 6 M00
M03Communications, navigation and time
Give the base an always-on link to Earth, a local network on the surface, and positioning and timing, mostly by buying services from relay networks already being built.
12027–2031$0.72–1.94B 6 M00, M02
M04Surface power grid
Build a hybrid power grid of tall solar towers on the sunlit ridges, a fission reactor for darkness, energy storage and high-voltage cables, sized to run the oxygen plant and the first habitat.
12028–2032$8.6–22.5B 5 M00, M02, M03
M05Site preparation, landing pads and roads
Robots build hardened landing pads, roads and protective berms so landers stop sandblasting the base and rovers can drive safely between sites.
12028–2032$2.88–7.3B 5 M01, M02, M04
M06Oxygen and water pilot plants
Make the first oxygen from rock and the first water from polar ice at pilot scale, proving the processes that every later milestone depends on.
12029–2033$3.8–9.8B 4 M01, M04, M05
M07Surface mobility
Get unpressurised rovers, a pressurised rover and utility robots working on the surface, so crews and cargo can move between every site.
22028–2033$1.2–3.3B 6 M02, M03, M05
M08First habitat and crewed sorties
Land the first surface habitat and fly crews for stays of two to four weeks, leaving more infrastructure behind on every visit.
22031–2035$10.6–30.2B 5 M02, M03, M04, M05, M07
M09Permanent crew presence
Move from visits to a crew that never leaves, with habitats buried under regolith for radiation protection, life support that recycles most air and water, and steady six-month rotations.
32034–2038$26.9–88.6B 5 M04, M06, M08
M10Growing food
Grow a growing share of the crew's food in buried, LED-lit greenhouses, starting with fresh vegetables and working toward most calories.
42035–2041$6.35–21.35B 5 M04, M06, M09
M11Propellant and industrial-scale ISRU
Scale the pilot plants up to hundreds of tonnes of oxygen and water a year, so landers can refuel on the Moon and the base pays its way.
42036–2042$14.0–42.0B 5 M04, M05, M06
M12Manufacturing and construction from regolith
Make metals, glass, solar cells, building blocks and spare parts on the Moon, so new structures and repairs need little from Earth.
42037–2044$5.5–16.0B 4 M05, M06, M11
M13Self-sustaining colony
Grow the base into a colony of 50–100 people that makes most of what it uses, with Earth supplying only electronics, medicines, specialist parts and people.
52040–2050$40.0–120.0B 4 M09, M10, M11, M12

Phases

Phase 0 · Foundations

Choose the site with data already in hand from lunar orbiters, ground-truth it with robotic prospectors, and lock the transport contracts. Nothing lands that the base depends on until the site is confirmed.

Phase 1 · Robotic outpost

Before any crew arrives, robots and cargo landers put down power, communications, landing pads and the first oxygen and water pilot plants. The outpost has to survive several lunar nights unattended.

Phase 2 · Crewed sorties

Crews visit for weeks at a time, living in the first surface habitat and using unpressurised and pressurised rovers. Each visit leaves more infrastructure behind.

Phase 3 · Permanent base

Continuous crew presence. Habitats are buried under regolith for radiation protection, life support recycles most water and air, and resupply drops to a steady cadence.

Phase 4 · Industrial base

The base starts making what it consumes, including oxygen and propellant, building materials, spare parts and food, so each crew member needs less from Earth every year.

Phase 5 · Self-sustaining colony

The base grows into a colony that produces most of its own mass needs, measured as the share of consumables and construction mass made on the Moon, with Earth supplying only high-tech parts and people.

ProjectOPEN MOON · Self-sustaining lunar colony
DocumentOM-100
Revision1.2 · Draft
EditEdit on GitHub