PLAN REV 1.2MILESTONES 14COMPONENTS 26UPDATED 2026-11-17LICENSE CC BY-SA 4.0
Bibliography

Sources

Every source cited anywhere in the plan, grouped by milestone and component. Official sources are preferred, then encyclopaedias and repositories, then reputable press.

M00 · Programme set-up and site selection

  1. NASA FY2026 Budget Technical Supplement (Lunar Reconnaissance Orbiter, PS-28/29) (May 2025)
  2. Univ. of Hawaii SOEST: Scarce ice in Moon's darkest regions (ShadowCam) (Mar 2026)
  3. ISRO: Chandrayaan-2 DFSAR observations reveal subsurface ice in lunar south polar regions (May 2026)
  4. NASA NTRS 20250011660: Artemis III Site Selection Update (2026)
  5. Peak of eternal light (Bussey et al. 2010; Speyerer & Robinson 2013 figures), Wikipedia (accessed Nov 2026)
  6. LROC: Islands in the Dark (Shackleton rim illumination) ()
  7. NASA ACR22 white paper: Why the Lunar South Polar Region (Oct 2023)
  8. NASA: Shrinking Moon causing moonquakes and faults near lunar south pole (Jan 2024)
  9. NASA: Artemis Accords (Section 11, deconfliction and safety zones) ()
  10. NASA: Uzbekistan becomes 77th Artemis Accords signatory (Oct 2026)
  11. UNOOSA: Outer Space Treaty (Article II) ()
  12. NASA Moon Base – Phases (2026)
  13. JPL IPN Progress Report 42-176: Lunar pole illumination and communications maps (Bryant) (Feb 2009)

M01 · Robotic prospecting and ground truth

  1. NASA: Lunar drill technology passes tests on the Moon (PRIME-1) (May 2025)
  2. NASA NTRS: MSolo PRIME-1 overview and results (2026)
  3. NASA: NASA selects Blue Origin to deliver VIPER rover to Moon's south pole (Sep 2025)
  4. Firefly: Blue Ghost completes 14 days of surface operations (Mar 2025)
  5. NASA: Radioisotope Heater Units fact sheet ()
  6. NASA Science: LCROSS mission ()
  7. NASA M2M-30044 Lunar Surface Data Book (LCROSS water ~5% by mass) (2025)
  8. JPL: Ice confirmed at the Moon's poles (M3) (Aug 2018)
  9. Univ. of Hawaii SOEST: Scarce ice in Moon's darkest regions (ShadowCam) (Mar 2026)
  10. UCLA Diviner: lunar temperatures ()
  11. JPL: NASA's Lunar Trailblazer mission ends (2025)
  12. Space.com: ispace lander crashed due to laser errors (Jun 2025)
  13. Zhang et al., Science Advances: radiation dose on the lunar surface (Chang'e-4 LND) (Sep 2020)
  14. Chang'e 7, Wikipedia (accessed Nov 2026)
  15. NASA Science: Cassini's radioisotope thermoelectric generators (82 RHUs, one watt each) ()
  16. Commercial Lunar Payload Services, Wikipedia (accessed Nov 2026)

C01.1 · Prospector rover

  1. NASA NTRS: VIPER Mission Overview (Andrews) (Apr 2020)
  2. NASA Science: VIPER rover and instruments (accessed Nov 2026)
  3. NASA NTRS: The VIPER mission, a resource-mapping mission (Ennico-Smith et al.) (Jun 2022)
  4. NASA: Lunar drill technology passes tests on the Moon (PRIME-1) (May 2025)
  5. NASA NTRS: MSolo PRIME-1 overview and results (2026)
  6. NASA: Radioisotope Heater Units fact sheet ()
  7. UCLA Diviner: lunar temperatures ()
  8. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  9. Astrobotic Lunar Landers Payload User's Guide (Aug 2021)
  10. Nokia: Nokia and Intuitive Machines deliver first cellular network to the Moon (Mar 2025)
  11. NASA: LunaNet Interoperability Specification v5 (Jan 2025)
  12. NSPM-20: Launch of spacecraft containing space nuclear systems (Aug 2019)
  13. Firefly: Blue Ghost lunar lander (accessed Nov 2026)
  14. Univ. of Hawaii SOEST: Scarce ice in Moon's darkest regions (ShadowCam) (Mar 2026)

M02 · Transport to the surface

  1. Firefly: Blue Ghost completes 14 days of surface operations (Mar 2025)
  2. Commercial Lunar Payload Services, Wikipedia (accessed Nov 2026)
  3. Blue Origin: Blue Moon Mark 1 (accessed Nov 2026)
  4. Starship flight 15, Wikipedia (Nov 2026)
  5. NASA OIG IG-26-004: Management of the Human Landing System contracts (Mar 2026)
  6. NASA HLS IAC 2026 presentation (cargo landers ~15 t) (Oct 2026)
  7. NASA NTRS: LSMS technology overview (2020)
  8. Astrobotic Lunar Landers Payload User's Guide ($1.2M/kg) (Aug 2021)
  9. NASA OIG IG-24-013: CLPS initiative (Jun 2024)
  10. NASA: NASA Shares Plans to Accelerate Artemis, Return to Moon (Nov 2026)
  11. NASA: NASA Awards Moon Base Transportation, Technology, Science Projects (CLPS 2) (Nov 2026)
  12. NASA: NASA Unveils Initiatives to Achieve America's National Space Policy (Mar 2026)
  13. NASA: Artemis II mission milestones, an image and video recap (Apr 2026)

C02.1 · Common payload interface

  1. Astrobotic Lunar Landers Payload User's Guide (Aug 2021)
  2. Firefly: Blue Ghost lunar lander (accessed Nov 2026)
  3. Intuitive Machines and Space Applications Services: lunar delivery services (ESA BSGN) (Feb 2024)
  4. Blue Moon (spacecraft), Wikipedia (accessed Nov 2026)
  5. NASA HLS IAC 2026 presentation (Oct 2026)
  6. NASA: Lightweight crane technology could find a home on the Moon (LSMS) (Feb 2021)
  7. NASA: LunaNet Interoperability Specification v5 (Jan 2025)
  8. Blue Origin: Blue Moon Mark 1 (accessed Nov 2026)
  9. Nokia: Nokia and Intuitive Machines deliver first cellular network to the Moon (Mar 2025)

C02.2 · Offloading crane

  1. NASA NTRS: LSMS technology overview (Jones, for Blue Origin) (Aug 2020)
  2. NASA: Lightweight crane technology could find a home on the Moon (Feb 2021)
  3. NASA NTRS: Trajectory tracking for the LSMS family of cable-driven cranes (2024)
  4. Blue Moon (spacecraft), Wikipedia (accessed Nov 2026)
  5. NASA HLS IAC 2026 presentation (Oct 2026)
  6. NASA NSSDC: Moon fact sheet (accessed Nov 2026)
  7. NASA NTRS: Vertical Solar Array Technology annual review (south pole thermal environment) (Sep 2023)

M03 · Communications, navigation and time

  1. NASA: NASA selects lunar relay contractor for Near Space Network services (Sep 2024)
  2. ESA: Moonlight programme (Oct 2024)
  3. Lunar Pathfinder, Wikipedia (accessed Nov 2026)
  4. Fierce Network: Nokia's lunar network on IM-2 (Mar 2025)
  5. NASA: NASA successfully acquires GPS signals on Moon (Mar 2025)
  6. NASA: Laser Communications Relay Demonstration, a year of experimentation (2023)
  7. NASA: LunaNet Interoperability Specification (Feb 2025)
  8. Astrobotic Payload User's Guide ($300k/kg to lunar orbit, $1.2M/kg to surface) (Aug 2021)
  9. NASA OIG IG-23-016: Deep Space Network (Jul 2023)
  10. NASA ACR22 white paper: Why the Lunar South Polar Region (Earth visibility) (Oct 2023)
  11. White House OSTP: celestial time standardization policy (Apr 2024)
  12. collectSPACE: Artemis II flyby video and Intuitive Machines lunar relays (Apr 2026)
  13. Nokia: Nokia and Intuitive Machines deliver first cellular network to the Moon (Mar 2025)
  14. NASA: Laser Communications Relay Demonstration (LCRD) overview (2026)
  15. OSTP: Policy on Celestial Time Standardization (memorandum) (Apr 2024)
  16. JPL IPN Progress Report 42-176: Lunar pole illumination and communications maps (Bryant) (Feb 2009)

C03.1 · Base communications node

  1. NASA: LunaNet Interoperability Specification v5 (Jan 2025)
  2. NASA ACR22 white paper: Why the Lunar South Polar Region (Earth visibility) (Oct 2023)
  3. NASA OIG IG-23-016: Deep Space Network (Jul 2023)
  4. NASA NTRS: VIPER Mission Overview (Andrews) (Apr 2020)
  5. NASA: NASA laser terminal enhances views during Artemis II mission (Apr 2026)
  6. NASA: Laser Communications Relay Demonstration, a year of experimentation (2023)
  7. Nokia: Nokia and Intuitive Machines deliver first cellular network to the Moon (Mar 2025)
  8. NASA: Deep Space Atomic Clock (DSAC) overview (accessed Nov 2026)
  9. White House OSTP: celestial time standardization policy (Apr 2024)
  10. NASA: NASA successfully acquires GPS signals on Moon (LuGRE) (Mar 2025)
  11. NASA NTRS: Vertical Solar Array Technology annual review (Sep 2023)
  12. Gläser et al. 2014, Icarus: Illumination at the lunar south pole (2014)
  13. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  14. NASA: NASA selects lunar relay contractor for Near Space Network services (Sep 2024)
  15. ESA: Moonlight programme (Oct 2024)

C03.2 · Rim relay mast

  1. NASA NTRS: Vertical Solar Array Technology annual review (Sep 2023)
  2. NASA: From Houston to the Moon, Johnson's thermal vacuum chamber tests lunar solar technology (2024)
  3. NASA NSSDC: Moon fact sheet (accessed Nov 2026)
  4. Shackleton (crater), Wikipedia (accessed Nov 2026)
  5. Gläser et al. 2014, Icarus: Illumination at the lunar south pole (2014)
  6. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  7. Astrobotic: LunaGrid-Lite completes critical design review (Aug 2025)
  8. Nokia: Nokia and Intuitive Machines deliver first cellular network to the Moon (Mar 2025)
  9. NASA: LunaNet Interoperability Specification v5 (Jan 2025)
  10. Astrobotic Lunar Landers Payload User's Guide (Aug 2021)
  11. NASA NTRS: VIPER Mission Overview (Andrews) (Apr 2020)

M04 · Surface power grid

  1. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  2. NASA NTRS 20220002315: Lunar power transmission for fission surface power (2022)
  3. SpaceNews: NASA and DOE to collaborate on lunar nuclear reactor development (Jan 2026)
  4. NASA RELEASE 22-090: Vertical Solar Array Technology awards (Aug 2022)
  5. Poston et al.: Results of the KRUSTY nuclear system test (2020)
  6. NewSpace Economy: What NASA's SPARC procurement reveals about Lunar Reactor-1 (secondary) (Sep 2026)
  7. Astrobotic: awarded lunar power study with VSAT-XL (Aug 2024)
  8. Astrobotic: LunaGrid-Lite completes critical design review (2025)
  9. NASA NTRS 20260002730: Regenerative fuel cell lunar cycle testing (Apr 2026)
  10. Colozza, NASA/CR: Small lunar base camp and ISRU power (Mar 2020)
  11. Gläser et al. 2014, Icarus: Illumination at the lunar south pole (2014)
  12. NASA: NASA seeks industry feedback on fission surface power (Aug 2025)
  13. Blue Origin: Blue Alchemist powers our lunar future (Feb 2023)
  14. Scientific American: White House plan for lunar nuclear power (NSTM-3) (Apr 2026)
  15. Oleson et al., NETS 2022: deployable 40 kWe fission surface power concept (NTRS 20220004670) (2022)
  16. SpacePolicyOnline: Great news for NASA in the House-Senate FY2026 appropriations report (Jan 2026)
  17. Astrobotic: Astrobotic developing XL solar array tech for lunar power infrastructure (SBIR Phase II) (Jul 2025)
  18. USAspending: NASA contract 80NSSC25C0032, Phase II SBIR VSAT-XL (Jun 2025)
  19. NASA: 2023 NASA Tipping Point selections (Jul 2023)
  20. NASA GCD annual review: Vertical Solar Array Technology (VSAT) project (Sep 2023)

C04.1 · Fission surface power unit

  1. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  2. Oleson et al., NASA GRC: A Deployable 40 kWe Lunar Fission Surface Power Concept (NETS 2022) (May 2022)
  3. INL/NASA: Fission Surface Power Technical Maturation Webinar (government reference design) (Sep 2025)
  4. Poston et al.: Results of the KRUSTY nuclear system test (2020)
  5. NewSpace Economy: What NASA's SPARC procurement reveals about Lunar Reactor-1 (secondary) (Sep 2026)
  6. NASA: NASA seeks industry feedback on fission surface power (Aug 2025)
  7. Barth & Pike, NASA GRC: Lunar power transmission for fission surface power (2022)

C04.2 · Vertical solar array towers

  1. NASA RELEASE 22-090: Vertical Solar Array Technology awards (Aug 2022)
  2. NASA: From Houston to the Moon, Johnson's thermal vacuum chamber tests lunar solar technology (2024)
  3. NASA GCD: Vertical Solar Array Technology project annual review (Sep 2023)
  4. Belbin, Mills & Chan, NASA LaRC: Government Reference Design of the VSAT Demonstrator (Apr 2024)
  5. Astrobotic: awarded lunar power study with VSAT-XL (Aug 2024)
  6. Astrobotic: developing XL solar array tech for lunar power infrastructure (Jul 2025)
  7. Contract record 80NSSC25C0032: Astrobotic VSAT-XL SBIR Phase II (Jun 2025)
  8. Redwire: second pair of iROSA solar arrays delivered (Jun 2022)
  9. SatNews: Astrobotic's LunaGrid VSAT enters thermal vacuum testing (press) (Jul 2024)
  10. Gläser et al. 2014, Icarus: Illumination at the lunar south pole (2014)
  11. Wikipedia: Peak of eternal light (2026)
  12. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  13. Wikipedia: Solar constant (2026)

C04.3 · Energy storage (regenerative fuel cells and batteries)

  1. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  2. Cain et al., NASA GRC: Performance of a Regenerative Fuel Cell System for the Lunar Surface (NTRS 20260002730) (Apr 2026)
  3. Smith et al., NASA GRC: Lunar South Pole Regenerative Fuel Cell System Efficiency Analysis (2022)
  4. Smith et al., NASA/TM-20210014627: Lunar Equator Regenerative Fuel Cell System Efficiency Analysis (Aug 2022)
  5. Oleson et al., NASA GRC: A Deployable 40 kWe Lunar Fission Surface Power Concept (NETS 2022) (May 2022)
  6. JPL: Low-temperature lithium-ion batteries for lunar and planetary missions (poster) (2021)
  7. Wikipedia: Faraday constant (2026)

C04.4 · HVDC grid and cable-laying rover

  1. Barth & Pike, NASA GRC: Lunar power transmission for fission surface power (2022)
  2. Oleson et al., NASA GRC: A Deployable 40 kWe Lunar Fission Surface Power Concept (NETS 2022) (May 2022)
  3. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  4. INL/NASA: Fission Surface Power Technical Maturation Webinar (Sep 2025)
  5. Astrobotic: LunaGrid-Lite completes critical design review (2025)
  6. SatNews: Astrobotic's LunaGrid VSAT enters thermal vacuum testing (press) (Jul 2024)
  7. NewSpace Economy: What NASA's SPARC procurement reveals about Lunar Reactor-1 (secondary) (Sep 2026)
  8. Wikipedia: Time-domain reflectometer (2026)
  9. Wikipedia: Aluminium (2026)
  10. NASA GCD: Vertical Solar Array Technology project annual review (Sep 2023)

M05 · Site preparation, landing pads and roads

  1. NASA NTRS: IPEx TRL 5 design overview (ASCEND 2024) (2024)
  2. NASA NTRS: ISRU Pilot Excavator design and scaling (2022)
  3. NASA NTRS 20150022134: RASSOR 2.0 (2015)
  4. ICON: ICON to develop lunar surface construction system with $57.2M NASA award (Nov 2022)
  5. NASA: NASA tests landing pad materials for future lunar missions ()
  6. NASA NTRS: In-situ lunar launch and landing pad construction with regolith and thermoset polymers (2022)
  7. NASA NTRS 20120000029: Lunar plume ejecta (Apollo 12 / Surveyor III) (2012)
  8. NASA: NASA enables construction technology for Moon and Mars exploration (Olympus, Duneflow) (2025)
  9. Gaier, NASA/TM-2005-213610: The effects of lunar dust on EVA systems during Apollo (2005)
  10. NASA: Break the Ice Lunar Challenge winners (Jun 2024)

C05.1 · Excavator robot (IPEx / RASSOR class)

  1. NASA NTRS: IPEx TRL 5 design overview (ASCEND 2024) (2024)
  2. NASA KSC fact sheet: RASSOR (NTRS 20150022134) (2015)
  3. NASA NTRS: ISRU Pilot Excavator design and scaling (2022)
  4. Connolly and Carrier, LPSC 2023: Updating lunar subsurface geotechnical properties (2023)
  5. Gaier, NASA/TM-2005-213610: The effects of lunar dust on EVA systems during Apollo (2005)
  6. NASA NTRS 20240001217: LTV remote driving with time delay (2024)

C05.2 · Hardened landing pad

  1. Gelino et al., NASA KSC: In-situ lunar launch and landing pad construction with regolith-thermoset polymer composites (2022)
  2. NASA: NASA tests landing pad materials for future lunar missions (Oct 2021)
  3. Gelino et al., NASA KSC: Lunar landing and launch pad construction, concepts and criteria (2020)
  4. NASA NTRS 20120000029: Further analysis on the mystery of the Surveyor III dust deposits (2012)
  5. NASA: NASA begins Moon mission plume-surface interaction tests (Aug 2026)
  6. NASA NTRS 20250010922: SCALPSS 1.1 post-landing terrain measurements (2026)
  7. PISCES: PISCES completes lunar landing pad bullseye (Jan 2016)
  8. Effinger, NASA MSFC: Microwave sintering lunar landing pads and horizontal infrastructure (MMPACT) (Dec 2020)
  9. ICON: Project Olympus, LSIC slides (Jan 2024)
  10. Connolly and Carrier, LPSC 2023: Updating lunar subsurface geotechnical properties (2023)

C05.3 · Regolith sintering and construction robot

  1. ICON: ICON to develop lunar surface construction system with $57.2M NASA award (Nov 2022)
  2. ICON: Project Olympus, LSIC slides (Jan 2024)
  3. NASA: NASA enables construction technology for Moon and Mars exploration (Olympus, Duneflow) (May 2025)
  4. Effinger, NASA MSFC: Microwave sintering lunar landing pads and horizontal infrastructure (MMPACT) (Dec 2020)
  5. Gelino et al., NASA KSC: In-situ lunar launch and landing pad construction with regolith-thermoset polymer composites (2022)

M06 · Oxygen and water pilot plants

  1. NASA NTRS: Molten regolith electrolysis ground demonstration (ICES 2026) (2026)
  2. NASA NTRS 20250004151: Carbothermal oxygen production reactor testing (2025)
  3. WUSTL: Chemical composition of lunar soil ()
  4. Blue Origin: Blue Alchemist hits major milestone (Sep 2025)
  5. ESA: ESA opens oxygen plant making air out of moondust (Jan 2020)
  6. NASA NTRS 20190030425: ISS Oxygen Generation Assembly (2019)
  7. NASA: Break the Ice Lunar Challenge winners (Jun 2024)
  8. Colozza, NASA/CR: ISRU plant power (1.63 kg/h O₂ at 25.83 kW) (Mar 2020)
  9. NASA Kennedy: NASA Kennedy breathes life into Moon soil testing (2025)
  10. NASA M2M-30044 Lunar Surface Data Book (2025)
  11. NASA: 2023 NASA Tipping Point selections (Jul 2023)

C06.1 · Oxygen-from-regolith pilot plant

  1. NASA NTRS: Large-scale demonstration of molten regolith electrolysis for oxygen production in a relevant environment (ICES 2026) (2026)
  2. NASA NTRS 20250004151: Carbothermal oxygen production reactor testing (2025)
  3. Blue Origin: Blue Alchemist hits major milestone (Sep 2025)
  4. Colozza, NASA/CR: ISRU plant power (1.63 kg/h O₂ at 25.83 kW) (Mar 2020)
  5. WUSTL: Chemical composition of lunar soil ()
  6. Kleinhenz and Paz, NASA: Case study for lunar ISRU systems utilizing polar water (ASCEND 2020) (Nov 2020)
  7. Nugent et al., NASA: Space exploration applications for development of high capacity cryocoolers (Dec 2020)
  8. Wikipedia: Oxygen (heat of vaporization, heat capacity) ()

C06.2 · Ice mining and water extraction plant

  1. Kleinhenz and Paz, NASA: Case study for lunar ISRU systems utilizing polar water (ASCEND 2020) (Nov 2020)
  2. NASA: California teams win $1.5 million in NASA's Break the Ice Lunar Challenge (Jun 2024)
  3. NASA: NASA missions uncover the Moon's buried treasures (LCROSS and LRO results) (Oct 2010)
  4. Colaprete et al., Science: Detection of water in the LCROSS ejecta plume (Oct 2010)
  5. Townsend, Mueller and Tamasy, NASA KSC: Dust tolerant commodity transfer interface mechanisms for planetary surfaces (Oct 2014)

C06.3 · Liquid oxygen and water storage

  1. Plachta et al., NASA GRC: Cryogenic boil-off reduction system testing (Jul 2014)
  2. Nugent et al., NASA: Space exploration applications for development of high capacity cryocoolers (Dec 2020)
  3. Plachta et al., NASA: NASA cryocooler technology developments and goals to achieve zero boil-off and to liquefy cryogenic propellants (Jul 2017)
  4. Wikipedia: Liquid oxygen ()
  5. Wikipedia: Multi-layer insulation ()
  6. Hines et al., NASA MSFC: Tank pressure control using zero boil-off active thermal control for LOXSAT (Jan 2023)
  7. Kleinhenz and Paz, NASA: Case study for lunar ISRU systems utilizing polar water (ASCEND 2020) (Nov 2020)
  8. NASA Glenn: NASA propellant tech could fuel long-duration missions (Radio Frequency Mass Gauge) (Mar 2025)
  9. Townsend, Mueller and Tamasy, NASA KSC: Dust tolerant commodity transfer interface mechanisms for planetary surfaces (Oct 2014)
  10. Wikipedia: Oxygen (heat of vaporization) ()

M07 · Surface mobility

  1. NASA RELEASE26-046: NASA provides update on Moon Base rovers, landers, missions (May 2026)
  2. NASA: NASA selects companies to advance Moon mobility for Artemis missions (LTV $4.6B IDIQ) (Apr 2024)
  3. NASA: NASA, Japan advance space cooperation, sign agreement for lunar rover (Apr 2024)
  4. NASA Moon Base – Phases (2026)
  5. NASA NTRS 20240001217: LTV remote driving with time delay (2024)
  6. JPL: CADRE ()
  7. NASA HLS IAC 2026 presentation (pressurised rover cargo delivery NET FY2032) (Oct 2026)
  8. Toyota: Lunar Cruiser (2026)
  9. NASA launch schedule (Moon Base: Intuitive Machines IM-3, early 2027) (Nov 2026)

C07.1 · Utility robots and payload carts

  1. Wikipedia: Modular Equipment Transporter (accessed Nov 2026)
  2. NASA RELEASE26-046: NASA provides update on Moon Base rovers, landers, missions (May 2026)
  3. Astrolab: FLEX services (accessed Nov 2026)
  4. JPL: CADRE ()
  5. NASA NTRS 20240001217: LTV remote driving with time delay (2024)
  6. NASA NTRS 20220002315: Lunar power transmission for fission surface power (2022)

M08 · First habitat and crewed sorties

  1. Thales Alenia Space: contract with ASI to develop lunar Multi-Purpose Habitation module (Jul 2025)
  2. TechCrunch: Sierra Space's inflatable habitat blows up as planned (Jan 2024)
  3. Space.com: ISS hits 98% water recycling milestone (Jun 2023)
  4. Axiom Space: completes NASA's critical design review for next-generation spacesuit (Nov 2026)
  5. NASA HLS IAC 2026 presentation (cargo landers, habitat delivery NET FY2033) (Oct 2026)
  6. NASA OIG IG-22-003: NASA's management of the Artemis missions ($4.1B per launch) (Nov 2021)
  7. NASA NTRS: Holden et al. 2026, communication delay study methods (5–12 s) (2026)
  8. Gaier, NASA/TM-2005-213610: Effects of lunar dust on EVA systems during Apollo (2005)
  9. NASA: Environmental Control and Life Support Systems reference (Apr 2025)
  10. NASA Moon Base – Phases (2026)
  11. European Spaceflight: ASI awards new lunar habitat contract to Thales Alenia Space (MPH: 3 m × 6 m, ~15 t, 2 crew, 7–30 days a year) (Jul 2025)
  12. NASA OIG: Spacesuit development delays could impact Artemis timeline and ISS operations (demonstrations could slip to 2031) (Apr 2026)

C08.1 · Rigid surface habitat module

  1. Thales Alenia Space: contract with ASI to develop lunar Multi-Purpose Habitation module (Jul 2025)
  2. European Spaceflight: ASI awards new lunar habitat contract to Thales Alenia Space (Jul 2025)
  3. Wikipedia: Thales Alenia Space (2026)
  4. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  5. NASA HLS IAC 2026 presentation (cargo landers, habitat delivery NET FY2033) (Oct 2026)
  6. Gaier, NASA/TM-2005-213610: Effects of lunar dust on EVA systems during Apollo (2005)
  7. Zhang et al., Science Advances: radiation dose on the lunar surface (Chang'e-4) (Sep 2020)
  8. TechCrunch: Sierra Space's inflatable habitat blows up as planned (Jan 2024)

C08.2 · Life support system

  1. NASA BVAD Rev2 (NASA/TP-2015-218570): Life Support Baseline Values and Assumptions (Feb 2022)
  2. NASA: Environmental Control and Life Support Systems reference (Apr 2025)
  3. Space.com: ISS hits 98% water recycling milestone (Jun 2023)
  4. Wikipedia: ISS ECLSS (2026)
  5. Takada et al., ICES-2019-107: Advanced Oxygen Generation Assembly for Exploration Missions (Jul 2019)
  6. Cmarik et al., ICES-2020-178: 4-Bed CO₂ Scrubber, from design to build (2020)
  7. Yates et al., ICES-2019-103: Hydrogen recovery by methane pyrolysis (Sabatier ~50% O₂ recovery) (Jul 2019)
  8. NASA TM 20210026041: Adsorbents and catalysts for atmosphere revitalization (TCCS) (Dec 2021)
  9. NASA NTRS 20030053429: Overview of ISS U.S. Fire Detection and Suppression System (2001)
  10. NASA NTRS 20220015741: Medical lessons learned from the Exploration Atmospheres study (8.2 psia, 34% O₂) (2022)

C08.3 · Dust lock and suitports

  1. Gaier, NASA/TM-2005-213610: Effects of lunar dust on EVA systems during Apollo (2005)
  2. NASA NTRS 20130013652: Suitport feasibility, pressurised donning tests with Marman clamp and pneumatic flipper suitports (2013)
  3. NASA BVAD Rev2 (NASA/TP-2015-218570): Life Support Baseline Values and Assumptions (Feb 2022)
  4. NASA NTRS 20150016082: History and flight development of the Electrodynamic Dust Shield (Aug 2015)
  5. NASA: dust shield successfully repels lunar regolith on Moon (Mar 2025)
  6. NASA NTRS 20250005380: CLPS EDS payload thermal design and analysis (2025)
  7. NASA OCHMO-TB-011: Lunar dust technical brief (NASA-STD-3001) (Nov 2022)
  8. NASA NTRS 20200000920: Current state of the Electrodynamic Dust Shield for mitigation (Feb 2020)

C08.4 · EVA system

  1. Axiom Space: completes NASA's critical design review for next-generation spacesuit (Nov 2026)
  2. Axiom Space: testing of next-gen spacesuit underway (Jan 2024)
  3. NASA OIG: Spacesuit development delays could impact Artemis timeline and ISS operations (Apr 2026)
  4. Coan, NASA NTRS 20210000827: Exploration EVA integrated HITL testing and analogs (Jan 2021)
  5. NASA BVAD Rev2 (NASA/TP-2015-218570): Life Support Baseline Values and Assumptions (Feb 2022)
  6. NASA NTRS 20260002907: xEMU 11-foot vacuum chamber upgrades test results (2026)
  7. Zhang et al., Science Advances: radiation dose on the lunar surface (Chang'e-4) (Sep 2020)
  8. NASA OCHMO: Radiation protection technical brief (600 mSv career limit) (2023)
  9. Gaier, NASA/TM-2005-213610: Effects of lunar dust on EVA systems during Apollo (2005)
  10. NASA NTRS 20220015741: Medical lessons learned from the Exploration Atmospheres study (8.2 psia, 34% O₂) (2022)

M09 · Permanent crew presence

  1. Space.com: ISS hits 98% water recycling milestone (Jun 2023)
  2. NASA NTRS 20190030425: ISS Oxygen Generation Assembly (2019)
  3. NASA NTRS ICES-2020-178: Four-Bed CO₂ Scrubber (2020)
  4. NASA NTRS 20190030371: Sabatier and oxygen recovery (2019)
  5. Zhang et al., Science Advances: radiation dose on the lunar surface (Chang'e-4) (Sep 2020)
  6. IAC-24 abstract: regolith shielding depth (OLTARIS) (2024)
  7. NASA OCHMO: Radiation protection technical brief (600 mSv career limit) (2023)
  8. NASA BVAD Rev2 (NASA/TP-2015-218570): crew consumables (Feb 2022)
  9. NASA NTRS 20230016304: Lunar logistics drivers and needs (2023)
  10. NASA NTRS 20230013896: Logistics rates beyond LEO (2.36 kg packaged food per crew-day) (2023)
  11. NASA NTRS 20205010170: partial gravity and bone (2020)
  12. NASA NTRS: NASEM 2025 presentation (radiation data gaps) (2025)
  13. NASA NTRS: Holden et al. 2026, communication delay (5–12 s) (2026)

C09.1 · Regolith radiation shielding

  1. Zhang et al., Science Advances: first measurements of the radiation dose on the lunar surface (Chang'e-4) (Sep 2020)
  2. Savage, IAC-24 abstract: Radiation shielding for long-term lunar settlements with regolith (OLTARIS, BON2020) (2024)
  3. NASA OCHMO-TB-020: Design for ionizing radiation protection (NASA-STD-3001 technical brief) (Dec 2022)
  4. Clowdsley, NASA LaRC: Protecting astronauts from space radiation on the lunar surface (LSIC talk) (Feb 2021)
  5. Simonsen and Slaba, NASA: Galactic cosmic radiation shielding, science on the lunar surface (NASEM) (2025)
  6. Grande et al., NASA: Protecting crew and surface systems with a long-duration Lunar Safe Haven (ASCEND 2021) (2021)
  7. Connolly, NASA JSC: An engineering guide to lunar geotechnical properties (2023)
  8. Nagihara et al., LPSC 2015: Restoration of the Apollo heat flow experiments metadata (2015)
  9. Evans et al., NASA MSFC: Meteoroid risk assessment of lunar habitat concepts (2006)
  10. NASA: Artemis I radiation measurements validate Orion safety for astronauts (Oct 2024)
  11. NASA NTRS: IPEx TRL 5 design overview (ASCEND 2024) (2024)

C09.2 · Solar particle event storm shelter

  1. NASA OCHMO-TB-020: Design for ionizing radiation protection (NASA-STD-3001 technical brief) (Dec 2022)
  2. Clowdsley, NASA LaRC: Protecting astronauts from space radiation on the lunar surface (LSIC talk) (Feb 2021)
  3. NOAA SWPC: Solar radiation storm (accessed Nov 2026)
  4. NASA Science: How NASA will protect astronauts from space radiation at the Moon (Aug 2019)
  5. NASA: Artemis I radiation measurements validate Orion safety for astronauts (Oct 2024)
  6. NASA BVAD Rev2 (NASA/TP-2015-218570): crew consumables (Feb 2022)
  7. NASA NTRS 20230013896: Logistics rates beyond LEO (2.36 kg packaged food per crew-day) (2023)

C09.3 · Medical bay

  1. Haas, NASA JSC: Artemis medical system overview (ASCEND 2023) (Oct 2023)
  2. Anderson et al., NASA HRP ExMC: Effect of mission duration on predicted medical risk for an extended lunar mission (AsMA 2024) (May 2024)
  3. JAXA: Remote-guided ultrasound on the ISS (ADUM) (2009)
  4. Holden et al., NASA HRP: Communication delays in cislunar space, aims and methods (2026)
  5. Diaz et al., npj Microgravity: Expiration analysis of the ISS formulary for exploration mission planning (Jul 2024)
  6. NASA HRP Human Research Roadmap: Risk of ineffective or toxic medications during long-duration exploration spaceflight (accessed Nov 2026)
  7. NASA: Counteracting bone and muscle loss in microgravity (Dec 2023)
  8. NASA OCHMO-TB-031: Exercise overview (NASA-STD-3001 technical brief) (Oct 2023)
  9. Jones, NASA Ames: The problem of partial gravity on the Moon and Mars (ICES) (2021)

M10 · Growing food

  1. NASA: Science in space, plant science (Veggie) (Jul 2023)
  2. NASA: Houston, we have a pepper (2021)
  3. Lunar Palace 1 (Lunar Palace 365 mission), Wikipedia (accessed Nov 2026)
  4. MELiSSA, Wikipedia (accessed Nov 2026)
  5. NASA: NASA awards $1.25 million to three teams at Deep Space Food finale (Aug 2024)
  6. NASA: Scientists grow plants in lunar soil (Univ. of Florida, 2022) (May 2022)
  7. NASA BVAD Rev2: food energy and mass per crew-day (Feb 2022)
  8. Fu et al.: Establishment of a closed artificial ecosystem to ensure human long-term survival on the Moon (bioRxiv preprint, Lunar Palace 365) (Jan 2021)

C10.1 · Buried greenhouse module

  1. NASA BVAD Rev2 (NASA/TP-2015-218570): crop growth, lighting and growth chamber data (Feb 2022)
  2. Kusuma, Pattison and Bugbee, Horticulture Research: From physics to fixtures to food, current and potential LED efficacy (Mar 2020)
  3. NASA: Science in space, plant science (Veggie) (Jul 2023)
  4. NASA: Houston, we have a pepper (2021)
  5. Lunar Palace 1 (Lunar Palace 365 mission), Wikipedia (accessed Nov 2026)
  6. NASA: Scientists grow plants in lunar soil (Univ. of Florida, 2022) (May 2022)

M11 · Propellant and industrial-scale ISRU

  1. NASA NTRS: Molten regolith electrolysis ground demonstration (ICES 2026) (2026)
  2. NASA HLS IAC 2026 presentation (propellant transfer demo schedule) (Oct 2026)
  3. Rocket Lab: LOXSAT ()
  4. Astrobotic Payload User's Guide ($1.2M/kg to surface) (Aug 2021)
  5. Colozza, NASA/CR: ISRU plant power (Mar 2020)
  6. NASA: NASA, industry prepare cryogenic fuel technology demo (LOXSAT) (May 2026)

C11.1 · Surface propellant depot and lander refuelling

  1. NASA HLS IAC 2026 presentation (propellant transfer test schedule) (Oct 2026)
  2. Hines et al., NASA MSFC: Tank pressure control using zero boil-off active thermal control for LOXSAT (Jan 2023)
  3. Nugent et al., NASA: Space exploration applications for development of high capacity cryocoolers (Dec 2020)
  4. Plachta et al., NASA GRC: Cryogenic boil-off reduction system testing (Jul 2014)
  5. Townsend, Mueller and Tamasy, NASA KSC: Dust tolerant commodity transfer interface mechanisms for planetary surfaces (Oct 2014)
  6. Heersema et al., NASA Armstrong: Magnetically latching cryogenic fluid coupler for lunar surface operations (Jan 2024)
  7. NASA Glenn: NASA propellant tech could fuel long-duration missions (Radio Frequency Mass Gauge) (Mar 2025)
  8. Wikipedia: Liquid oxygen ()
  9. Wikipedia: Oxygen (heat of vaporization, heat capacity) ()
  10. Kleinhenz and Paz, NASA: Case study for lunar ISRU systems utilizing polar water (ASCEND 2020) (Nov 2020)

M12 · Manufacturing and construction from regolith

  1. Blue Origin: Blue Alchemist powers our lunar future (Feb 2023)
  2. ESA: ESA 3D prints first metal part on the ISS (Sep 2024)
  3. NASA NTRS 20190030402: In-space manufacturing on ISS (2019)
  4. Redwire: Regolith manufacturing technology (Dec 2021)
  5. ICON: $57.2M NASA award (Nov 2022)
  6. ESA: ESA opens oxygen plant making air out of moondust (Jan 2020)
  7. ESA: Building a lunar base with 3D printing (Jan 2013)
  8. Geology of the Moon (regolith composition), Wikipedia (accessed Nov 2026)
  9. Blue Origin: Blue Alchemist hits major milestone toward permanent, sustainable lunar infrastructure (Sep 2025)
  10. NASA M2M-30044 Lunar Surface Data Book (south pole is highlands terrain) (Mar 2025)

C12.1 · Fabrication shop

  1. ESA: ESA launches first metal 3D printer to ISS (Jan 2024)
  2. ESA: ESA 3D prints first metal part on the ISS (Sep 2024)
  3. ESA: 3D-printed metal, unlocking crew autonomy (Jul 2026)
  4. NASA NTRS 20190030402: Overview of the In-Space Manufacturing technology portfolio (Jul 2019)
  5. NASA NTRS 20180006405: In-Space Manufacturing at NASA Marshall (AIAA SPACE 2018) (2018)
  6. Redwire: Redwire to demonstrate in-space additive manufacturing for lunar surface on the ISS (Jul 2021)
  7. NASA-STD-6030: Additive manufacturing requirements for spaceflight systems (Apr 2021)
  8. ESA: ESA opens oxygen plant making air out of moondust (Jan 2020)
  9. Blue Origin: Blue Alchemist powers our lunar future (Feb 2023)
  10. Geology of the Moon (regolith composition), Wikipedia (accessed Nov 2026)

M13 · Self-sustaining colony

  1. NASA OIG IG-22-005: ISS operations cost (~$3B/yr) (Nov 2021)
  2. phys.org: Lunar lava tube cave (Carrer et al., Nature Astronomy) (Jul 2024)
  3. PwC: Lunar market assessment, 2nd edition (Building the lunar economy) (Jan 2026)
  4. UNOOSA: Outer Space Treaty ()
  5. NASA: Artemis Accords ()
  6. US Public Law 114-90 (Commercial Space Launch Competitiveness Act) (Nov 2015)
  7. LROC: Marius Hills pit – lava tube skylight? ()
ProjectOPEN MOON · Self-sustaining lunar colony
DocumentOM-900
Revision1.2 · Draft
EditEdit on GitHub