Plan / Phase 4 / M12
M12 · Phase 4 · 2037–2044

Manufacturing and construction from regolith

Make metals, glass, solar cells, building blocks and spare parts on the Moon, so new structures and repairs need little from Earth.
Objective

Produce at least 80% of new construction mass and at least 50% of spare-part mass (by mass, not by value) from lunar materials.

Exit criteria · what "done" means
#Criterion
EC-1≥80% of new construction mass from lunar materials over a year.
EC-2≥50% of spare-part mass printed or made on site over a year.
EC-3First lunar-made solar array producing power on the grid.
Workstreams · 4
1

Metals

Recover metals from oxygen-plant by-products.

  • Iron and silicon from MRE
  • Mixed metals from molten salt electrolysis
  • Aluminium extraction research
2

Construction

Build with regolith.

  • Regolith construction systems (ICON Olympus)
  • Printed regolith dome (ESA / Foster+Partners concept)
  • Sintered bricks
3

Parts manufacturing

Print what breaks.

  • Metal 3D printing (ESA ISS printer heritage)
  • Polymer printing and recycling (ISS AMF, Refabricator)
  • Machining for finishing
4

Solar cells

Make power hardware locally.

  • Silicon from regolith
  • Cover glass from by-products
  • Array assembly
Technology · what we use and how ready it is
TechnologyUsed forStatus todayTRL
Blue Origin Blue Alchemist9Silicon, solar cells, wire from regolithCompany reports solar cells and wire from simulant; passed CDR 2025; autonomous ground demo planned 2026 5 develop
ESA metal 3D printer on ISS2Printing metal partsFirst metal part printed in space, Aug 2024 7
Redwire / Made In Space AMF on ISS3Polymer partsCommercial polymer printer on ISS (ABS, ULTEM, HDPE); parts printed since at least Feb 2017 9
Redwire Regolith Print4Printing with regolith simulantPrinted with regolith simulant on ISS (launched Aug 2021) 5
ICON Project Olympus5Regolith construction$57.2M NASA SBIR Phase III contract 4 develop
Molten salt electrolysis (Metalysis/ESA)6Metals + oxygenESA prototype plant (2020); leaves a tangle of mixed metals 4 develop
Components · detailed breakdowns
Plan of action

What regolith contains

Average lunar surface composition8:

Oxide Maria Highlands
FeO ~14.1% ~5.9%
Al₂O₃ ~14.9% ~24.0%
TiO₂ ~3.9% ~0.6%
SiO₂ ~45% ~45%

What this means at the base: the south pole is highlands terrain10, so the regolith is richer in aluminium and poorer in iron.

Step-by-step

  1. Polymer and metal printers inside the habitat, building on ISS heritage23.
  2. Regolith construction for berms, pads and shells, building on ICON’s NASA-funded work5 and ESA’s regolith 3D printing tests7.
  3. Metal recovery from oxygen-plant by-products16.
  4. Solar cells from regolith. Blue Origin reports making solar cells from simulant19. Install the first lunar-made array.
Cost build-up
ItemLowHighBasis
Factory equipment development$1.0B$3.0BESTIMATE
Delivery of factory equipment (~20 t)$4.0B$12.0B20 t × $0.2–0.6M/kg (ESTIMATE)
Operations$0.5B$1.0BESTIMATE
Total$5.5B$16.0BESTIMATE factory equipment and delivery

Mission profile

Window2037–2044
Phase4
Depends onM05, M06, M11
MetalsIron, aluminium, silicon from regolith processing by-products
ConstructionSintered and printed regolith structures
PartsMetal and polymer 3D printing; recycling
PowerSolar cells from regolith
Cost$5.5–16.0B EST.
Lowest critical TRL · 4 / 9

Failure modes · 3

FM-1 · High
Many processes are only proven in labs (TRL 4)
Fix: Start with the most mature (printing, sintering); add metals as they mature
FM-2 · High
Electronics and precision parts can't be made locally
Fix: Ship electronics; make structures, enclosures and bulk parts locally
FM-3 · Medium
Quality control of lunar-made parts
Fix: Test coupons from every batch; tensile testing on site

Sources

  1. Blue Origin: Blue Alchemist powers our lunar future (Feb 2023)
  2. ESA: ESA 3D prints first metal part on the ISS (Sep 2024)
  3. NASA NTRS 20190030402: In-space manufacturing on ISS (2019)
  4. Redwire: Regolith manufacturing technology (Dec 2021)
  5. ICON: $57.2M NASA award (Nov 2022)
  6. ESA: ESA opens oxygen plant making air out of moondust (Jan 2020)
  7. ESA: Building a lunar base with 3D printing (Jan 2013)
  8. Geology of the Moon (regolith composition), Wikipedia (accessed Nov 2026)
  9. Blue Origin: Blue Alchemist hits major milestone toward permanent, sustainable lunar infrastructure (Sep 2025)
  10. NASA M2M-30044 Lunar Surface Data Book (south pole is highlands terrain) (Mar 2025)
ProjectOPEN MOON · Self-sustaining lunar colony