Hardened landing pad
Sub-grade preparation
Excavators clear rocks, level the site and compact the loose top layer so the fused surface sits on a firm base.
- Rock clearing and survey
- Grading to a level surface
- Compaction passes
- Drainage-free cross-slope check by lidar
Fused surface (sintered or pavers)
The core is fused regolith, either laid in place by the C05.3 robot or as interlocking pavers with grouted joints.
- In-place laser or microwave fused layers
- Interlocking sintered pavers
- Regolith-polymer grout for joints
- Compacted outer apron
Edge and ejecta berm
A ring of piled regolith stops low-angle spray that leaves the pad.
- Piled regolith berm
- Sintered or bagged berm crest
- Gaps for road access, offset so there is no line of sight to the base
Landing markers and lighting
Passive and active markers help the lander's navigation system find the pad centre in low sun or darkness.
- Radio beacon at pad centre
- LED edge lights on the grid
- High-contrast reflective markers
- Pad survey map shared with lander providers
Inspection and repair
Cameras and witness plates measure what each landing does; robots fix damage between landings.
- Stereo cameras on the berm (SCALPSS-type)
- Witness plates at 100 m, 500 m and 1 km
- Post-landing lidar scan of the surface
- Repair kit: pavers and polymer grout
What it does
A rocket plume on bare regolith erodes the surface and throws particles out at high speed. These particles obscure sensors, crater the ground under the lander, and hit nearby equipment3. In 1969 Apollo 12 landed 155 m from Surveyor III. A NASA analysis found that small dust particles could reach Surveyor at up to 130 m/s4. A pad gives a known, firm surface that makes little ejecta. A barrier around it catches what does escape3.
How it works
NASA KSC splits a pad into a central zone for normal landings, an outer perimeter for off-target landings and dust control, and blast barriers3. Open Moon follows that layout.
Sub-grade. Lunar regolith is loose at the top. Its bulk density is about 1.30 g/cm³ at the surface, rising to 1.92 g/cm³ below 1 m10. It also compacts less than simulants on Earth8. So C05.1 excavators clear rocks, level the site and compact it before any fusing. In 2015 the PISCES team in Hawaii, working with NASA Swamp Works, used a rover to grade a site and lay 100 basalt pavers7.
Fused surface. NASA and Masten hot-fire tested sintered basalt pavers, carbon fibre blankets and regolith-polymer pavers2. They used a 444 N methane-oxygen engine. Erosion was heavy under the most extreme thermal case, but every test article stopped regolith ejecta1. One test had nine sintered pavers with polymer grout in the joints1. ICON’s laser-fused regolith reached about 50,000 psi compressive strength. Its density is 2.7 g/cm³9. Open Moon fuses the core with the C05.3 robot. It lays pavers where joints are needed.
Berm. A ring of piled regolith around each pad blocks low-angle spray. Road gaps are offset, so no straight path leads from the pad centre to the base.
Markers and lighting. Pad size depends on how accurately landers land. Landing aids and terrain-relative navigation shrink the landing ellipse and the pad1. Open Moon puts a radio beacon at the centre and lights and reflectors on the edge. This is a design choice; no pad aids have flown.
Inspection. NASA’s SCALPSS stereo cameras imaged a real landing on Blue Ghost Mission 1 in 20256. NASA is now using them in vacuum-chamber plume tests to measure craters, the ejecta sheet angle and particle speeds5. Open Moon puts the same kind of cameras on each berm.
Sizing
| Item | Pad 1 | Pad 2 | Basis |
|---|---|---|---|
| Fused core diameter | 30 m | 50 m | Design choice |
| Core area | 707 m² | 1,963 m² | π × r² |
| Thickness | 50 mm | 50 mm | Design choice, within NASA’s 25–50 mm study range1 |
| Fused volume | 35 m³ | 98 m³ | area × 0.05 |
| Fused mass | ~95 t | ~265 t | × 2.7 t/m³9 |
| Polymer for same pad | — | ~35 t | NASA table, 50 m at 50 mm1 |
NASA’s Artemis pad requirement was 200 m across. NASA’s landing experts were working to cut it to 100 m1. Pad 2’s compacted apron reaches 100 m for that reason. A polymer-only pad would need far more than the ~2 t of binder in the M05 budget. So polymer is kept for grout and repairs.
Testing and qualification
- Coupon hot-fire tests of fused samples and grouted pavers, as in the NASA/Masten campaigns1.
- Vacuum plume tests on a fused test bin at NASA Langley-type facilities5.
- Full-size paver section on Earth, built by the same robots, then thermal-cycled.
- Pad 1 on the Moon: a small lander lands on it. Cameras and witness plates measure ejecta. Lidar scans for damage.
- Pad 2 is cleared for heavy landers only after pad 1 data match the models.
Open questions
- What plume pressure and temperature will heavy landers put on the pad, and at what height?
- Is a continuous fused slab or a paver field better under thermal cycling?
- Which landing aids will lander providers actually use?
- How far must the berm sit from the pad edge to catch most spray?
| Severity | Problem | Solution |
|---|---|---|
| Critical | No fused pad has been tested under a full-size lander engine, on Earth or the Moon | Build pad 1 first and use it only for small landers; measure; scale up step by step before any heavy lander. |
| Critical | Heavy landers land with a large error; NASA's Artemis pad requirement was 200 m across | Work with lander providers to cut the ellipse to about 100 m with beacons and terrain-relative navigation; keep pad 2's apron to 100 m. |
| High | Hot-fire tests eroded pavers under the most extreme thermal conditions | Thicker centre zone; replaceable centre pavers; inspect and repair after every landing. |
| High | Lunar regolith compacts less than simulants, so the base may settle and crack the surface | Use M01 geotechnical data; test compaction on site before sintering; leave expansion joints. |
| High | Polymer binder must be shipped from Earth; a 50 m polymer pad needs about 35 t | Use local fused regolith for the pad; keep polymer for grout and repairs only. |
| Medium | Thermal cycling may crack a large fused slab | Build in pavers or panels with grouted joints rather than one slab. |
| Medium | Landing aids on the pad edge can be damaged by the plume | Mount lights low behind the berm crest; make beacons cheap and replaceable. |
Specification
| Quantity | 2 pads (plan design choice) |
| Pad 1 | 30 m sintered core, small and medium landers (design choice) |
| Pad 2 | 50 m sintered core plus compacted apron to 100 m, heavy landers (design choice) |
| Surface thickness | 50 mm fused regolith (design choice; NASA study range 25–50 mm) |
| Surface mass | ~95 t (pad 1) and ~265 t (pad 2), all local regolith (ESTIMATE) |
| Berm | ~2 m high ring around each pad (ESTIMATE) |
| Landing aids | Beacons, lights and reflective markers on the pad edge |
| Inspection | Stereo cameras and witness plates at every landing |
| Material from Earth | Polymer grout for repairs only, under 2 t |
Sources
- Gelino et al., NASA KSC: In-situ lunar launch and landing pad construction with regolith-thermoset polymer composites (2022)
- NASA: NASA tests landing pad materials for future lunar missions (Oct 2021)
- Gelino et al., NASA KSC: Lunar landing and launch pad construction, concepts and criteria (2020)
- NASA NTRS 20120000029: Further analysis on the mystery of the Surveyor III dust deposits (2012)
- NASA: NASA begins Moon mission plume-surface interaction tests (Aug 2026)
- NASA NTRS 20250010922: SCALPSS 1.1 post-landing terrain measurements (2026)
- PISCES: PISCES completes lunar landing pad bullseye (Jan 2016)
- Effinger, NASA MSFC: Microwave sintering lunar landing pads and horizontal infrastructure (MMPACT) (Dec 2020)
- ICON: Project Olympus, LSIC slides (Jan 2024)
- Connolly and Carrier, LPSC 2023: Updating lunar subsurface geotechnical properties (2023)