PLAN REV 1.2MILESTONES 14COMPONENTS 26UPDATED 2026-11-17LICENSE CC BY-SA 4.0
C03.2 · Component of M03

Rim relay mast

A self-standing mast with a small radio station, set on the rim of a shadowed crater, so rovers and crews working on the crater floor stay connected to the base network.
Sub-components · 5
1

Deployable mast

A mast that packs short for launch and extends on the surface, carrying the antennas and solar panel high above the rim.

  • Helical metal-band or rolled composite mast
  • Deployer drive and motor
  • Top plate with antenna mounts
  • Single-axis Sun-tracking gimbal for the panel
  • Retraction for relocation
BASIS: NASA VSAT mast prototypes (Honeybee, Lockheed Martin, Astrobotic) · TRL 5
2

Radio package

A small cellular cell and Wi-Fi access point point down into the crater, and a backhaul link points back to the base node (C03.1).

  • LTE small cell with sector antenna aimed into the crater
  • Wi-Fi mesh access point
  • Point-to-point backhaul radio (or fibre in the cable version)
  • Small router and data store
  • Status beacon for rover navigation
BASIS: Nokia Bell Labs LSCS (IM-2); 802.11n lander WLAN · TRL 6
3

Power

A vertical solar panel and battery keep the mast running through rim shadow periods, or a power cable from the base replaces most of the battery.

  • Vertical solar panel, ~1.5 m² (ESTIMATE)
  • ~10 kWh Li-ion battery (solar version)
  • Power control and distribution
  • Cable connector for grid power
  • Electrodynamic dust shield on the panel (option)
BASIS: VSAT vertical solar arrays; LunaGrid-Lite cable power · TRL 5
4

Base, anchoring and leveling

Wide legs, auto-leveling and regolith ballast hold the mast upright on a sloping rim.

  • Three or four adjustable legs
  • Auto-leveling actuators
  • Ballast trays filled with regolith by rover or crane
  • Footpads sized for soft regolith
  • Tilt sensor
BASIS: VSAT auto-leveling base; ballast is a design choice · TRL 4
5

Thermal and housing

An insulated box keeps the radio electronics warm through shadow periods and sheds heat in sunlight.

  • Insulated electronics box
  • Radiator facing away from the Sun
  • Survival heaters
  • Multi-layer insulation
  • Dust seals
BASIS: Standard spacecraft practice · TRL 6
Engineering notes

What it does

Radio needs line of sight. A rover on the floor of a deep, permanently shadowed crater cannot see the base, Earth or most relay satellites. A rim relay mast stands on the crater rim, looks down into the worksite and passes data back to the base node (C03.1). It turns the PSR from a place of short, silent sorties into a connected worksite. M03 requires at least 10 Mbps to every robot, including at least one PSR worksite.

How it works

  • Mast. NASA’s VSAT project developed masts for lunar solar arrays. Its goals were a 10 m height (5 m threshold), stable deployment on slopes of up to 15° (10° threshold), 10 deploy-and-retract cycles, and survival from −180 °C to +175 °C1. Honeybee used a helical metal-band mast, Lockheed Martin a thin rolled composite mast, and Astrobotic a self-propelled cart with a gimbal1. Prototypes were tested in thermal vacuum at NASA Johnson in 2024. Those tests required deployment on a curved surface and survival through 96 h of darkness2. We use the same masts to carry antennas.
  • Radio. Nokia’s network-in-a-box ran its base station, radio and core on IM-28. The rim mast carries a smaller cell of the same kind, plus a Wi-Fi access point. Astrobotic landers already use 802.11n WLAN for deployed payloads10. LunaNet expects surface users on Wi-Fi or 3GPP links, but the frequency bands for lunar cellular service are still under study9.
  • Power. Rim peaks at Shackleton are lit about 80–90% of the time4. The best ridge point is lit 96% of the time at 10 m height5. NASA cites intermittent darkness of up to about 100 h at the pole6. Where the rim is close enough to the base, a power cable is simpler: Astrobotic’s LunaGrid-Lite plans to send 1 kW over 500 m of light cable7.
  • Anchoring. NASA’s VSAT work included auto-leveling bases1. We add regolith ballast trays, filled by a rover or by the crane (C02.2), to resist tipping.
  • Why it matters for prospecting. VIPER planned only about 6 h of work per PSR visit11. With a live link, operators can steer the rover and drill in real time instead of planning blind.

Sizing

Line of sight (arithmetic). On a smooth sphere, the distance to the horizon is d = √(2Rh), with R = 1,737.4 km3:

  • From a 10 m mast: √(2 × 1,737,400 × 10) ≈ 5,900 m.
  • From a 2 m rover antenna: √(2 × 1,737,400 × 2) ≈ 2,640 m.
  • So mast-to-rover range over flat ground is about 5.9 + 2.6 ≈ 8.5 km.

Into a crater (Shackleton as the worst case). Shackleton is 21 km across, 4.2 km deep, with a 6.6 km floor and walls of about 30°4. From the rim to the floor’s edge: horizontal (21 − 6.6) ÷ 2 = 7.2 km, drop 4.2 km, slant range √(7.2² + 4.2²) ≈ 8.3 km. To the floor centre: √(10.5² + 4.2²) ≈ 11.3 km. The sight line to the floor’s edge drops at atan(4.2 ÷ 7.2) ≈ 30°, about the same as the wall. Any bulge in the wall therefore blocks the view, and mast sites must be checked against real terrain data. The PSRs chosen in M01 will mostly be smaller craters within cable distance of the base, which makes this easier.

Power and mass (ESTIMATE). Load: LTE cell 60 W + backhaul 20 W + computer and heaters 20 W = 100 W. Riding through 100 h of darkness needs 100 × 100 = 10 kWh, which is 10,000 ÷ 160 Wh/kg6 ≈ 63 kg of Li-ion.

Item Solar version (kg) Cable version (kg)
Mast and deployer 40 40
Radios and router 15 15
Solar panel 10 0
Battery 63 6 (1 kWh buffer)
Base, legs, ballast trays 20 20
Thermal and harness 10 10
Subtotal 158 91
With 30% margin ~205 ~120 (plus cable)

Testing and qualification

  1. Coverage model. Use LOLA terrain to predict coverage from candidate rim sites into each M01 PSR. Publish the code.
  2. Mast tests. Deploy, retract and redeploy 10 times on a 15° slope. Run thermal-vacuum tests to −180 °C, following the VSAT approach1.
  3. Radio field test. On an Earth crater rim, measure LTE and Wi-Fi throughput to a rover on the floor at 1–10 km.
  4. Dark survival test. Run the full mast in a cold chamber through a 100 h dark period on battery.
  5. On the Moon. Place the first mast on the rim of the first PSR worksite. Drive a rover into the crater and log throughput against position. Prove at least 10 Mbps across the worksite.

Open questions

  • Which rim sites give the best view into the PSRs that M01 selects? Can contributors run the LOLA viewshed analysis?
  • Is LTE or Wi-Fi mesh the better choice for a single crater worksite?
  • Is it cheaper to lay a power and fibre cable to the rim than to fly a 63 kg battery?
  • Could the same mast also hold a vertical solar array for the M04 grid, sharing one deployment?
  • How should rovers relay through each other when they are below the mast’s line of sight?
Problems and solutions · 7
SeverityProblemSolution
HighThe crater wall's shape blocks the line of sight to parts of the floorChoose mast sites from LOLA terrain models before landing. Carry a rover-borne repeater for blind spots.
HighThe mast buckles, unravels or tips over on a sloped, soft rimUse auto-leveling legs and regolith ballast, and keep a low deployment height until the base is proven stable. Test buckling and unraveling, both of which are open VSAT risks.
HighRim shadow periods drain the battery and the cold kills the radio, as happened to Nokia's device module on IM-2Size the battery for ~100 h of darkness, insulate the box well, and use a power cable from the base where possible.
MediumFrequencies for lunar surface cellular networks are not yet approvedKeep Wi-Fi mesh as a fallback and keep LTE equipment able to retune.
MediumDust from rovers and landers coats the solar panel and antennasKeep masts far from roads and pads. Use a dust shield or brush, and the option of cable power.
MediumA mast on a rim is a hazard to rovers and landersMap every mast in the base hazard map and the landing keep-out zones. Fit a navigation beacon.
MediumMoving or replacing a mast needs a rover and a craneUse a retractable mast and the standard C02.1 lifting lugs so the C02.2 crane can move it.

Specification

RoleExtend the base LTE / Wi-Fi network into a PSR worksite and backhaul it to the base
Mast height~10 m (NASA VSAT goal; 5 m threshold)
RadioLTE small cell + Wi-Fi mesh access point + point-to-point backhaul (design choice)
Line of sight~5.9 km to the horizon over flat ground from 10 m; ~8.5 km to a rover's 2 m antenna (arithmetic)
Load~100 W continuous (ESTIMATE)
PowerVertical solar panel + ~10 kWh battery, or cable from the base where within reach
Mass~205 kg solar version, ~120 kg cable version, incl. 30% margin (ESTIMATE)
SiteCrater rim, slope up to 15° (VSAT goal)
Quantity3: one per PSR worksite (2) + 1 spare (design choice)
Delivery classSmall or medium lander; placed by rover and crane (C02.2)
Technology readiness · TRL 5 / 9

Sources

  1. NASA NTRS: Vertical Solar Array Technology annual review (Sep 2023)
  2. NASA: From Houston to the Moon, Johnson's thermal vacuum chamber tests lunar solar technology (2024)
  3. NASA NSSDC: Moon fact sheet (accessed Nov 2026)
  4. Shackleton (crater), Wikipedia (accessed Nov 2026)
  5. Gläser et al. 2014, Icarus: Illumination at the lunar south pole (2014)
  6. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  7. Astrobotic: LunaGrid-Lite completes critical design review (Aug 2025)
  8. Nokia: Nokia and Intuitive Machines deliver first cellular network to the Moon (Mar 2025)
  9. NASA: LunaNet Interoperability Specification v5 (Jan 2025)
  10. Astrobotic Lunar Landers Payload User's Guide (Aug 2021)
  11. NASA NTRS: VIPER Mission Overview (Andrews) (Apr 2020)