PLAN REV 1.2MILESTONES 14COMPONENTS 26UPDATED 2026-11-17LICENSE CC BY-SA 4.0
C02.1 · Component of M02

Common payload interface

One published standard for how every Open Moon payload bolts down, plugs in, stays warm and gets lifted, so the same payload can fly on any selected lander without a redesign.
Sub-components · 6
1

Mechanical mount and adapter plate

Each payload bolts to its own adapter plate, and the plate bolts to the lander, so payload design does not wait for bolt-hole assignment.

  • Adapter plate (part of payload mass)
  • M5 bolts into lander helicoil inserts, 75 mm grid
  • Thermal and vibration isolators
  • Grounding and bonding strap
  • Per-lander adapter drawings
BASIS: Astrobotic adapter-plate practice · TRL 8
2

Pallet and load paths

For payloads from about 100 kg up to several tonnes, a standard pallet carries loads into four lander hard points.

  • Machined aluminium pallet frame
  • Four hard-point fittings with shear cones
  • Hold-down and release mechanisms
  • Forklift tine pockets
  • Kinematic seats for reattaching on the surface
BASIS: Design choice; release rules from lander user guides · TRL 5
3

Electrical interface

One connector family and one voltage for every lander, with switched, current-limited circuits.

  • MIL-DTL-38999 Series III connector (regular and small)
  • 28 V operations and heater circuit
  • 28 V actuation circuit
  • Release-signal lines
  • Single-point ground return
BASIS: Astrobotic Standard Electrical Connector · TRL 8
4

Data and timing interface

Standard serial links for small payloads, Ethernet/IP for larger ones, and a time pulse so every payload logs the same time.

  • RS-422 with SLIP/UDP
  • SpaceWire for high-rate payloads
  • Ethernet/IP (pallet class)
  • Time-at-tone sync
  • Wireless fallback after deployment (WLAN or LTE)
BASIS: Astrobotic data services; LunaNet IP-based architecture · TRL 7
5

Thermal and dust covers

Payloads look after their own temperature and keep their optics and connectors covered until they are clear of landing dust.

  • Low-conductance standoffs (below 0.1 W/K)
  • Payload-owned heaters and radiators
  • Multi-layer insulation blankets
  • Hinged dust covers released after landing
  • Connector dust caps
BASIS: Lander user-guide practice; dust covers are a design choice · TRL 6
6

Lifting points

Every payload heavier than a person can lift carries standard lugs and pockets that the offloading crane (C02.2) can grab.

  • Four lifting lugs on the pallet corners
  • Forklift tine pockets
  • Hoist spreader bar
  • Centre-of-mass marking
  • Fiducial targets for crane cameras
BASIS: Matches LSMS hoist and forklift tools · TRL 5
Engineering notes

What it does

Open Moon buys rides on several landers (M02). Each lander company publishes its own payload rules, and no two are the same. The common payload interface is one Open Moon standard that sits between our payloads and every lander. A payload built to it needs only a small adapter, not a redesign, to move from one lander to another. That matters because M02 plans to fly critical items twice, on different providers.

How it works

  • Mechanical. Astrobotic’s decks give about 0.5 m² per side, with locking helicoil inserts for M5 bolts on a 75 mm grid. Astrobotic recommends an adapter plate between payload and deck. The plate counts as payload mass1. We adopt the same grid and the adapter-plate rule for small payloads. Larger payloads ride on a standard pallet (our design) that bolts to four lander hard points.
  • Loads. Astrobotic quotes a random-vibration limit of 14.1 Grms for 2 minutes per axis. It points payloads to NASA’s GEVS standard for random, shock and acoustic tests1. We qualify every payload to an envelope covering all selected landers.
  • Electrical. Power comes through a Glenair MIL-DTL-38999 Series III connector. Each payload gets two 28 ± 5% V DC circuits, one for operations and heaters and one for deployments. Both are current-regulated and protected1. We adopt the same connector family, voltage and two-circuit split.
  • Data and time. RS-422 (with SLIP/UDP) or SpaceWire, both carrying “time at the tone” so payload clocks match the lander. After deployment the payload can switch to 802.11n WLAN1. LunaNet uses IP networking and expects surface links built on IETF and 3GPP standards7, so the pallet class adds Ethernet/IP. Nokia’s IM-2 network showed that 3GPP cellular equipment can run on a lander9.
  • Thermal and dust. The payload must be thermally isolated from the lander, with a conductance below 0.1 W/K, and must control its own temperature1. We add dust covers on optics and connectors, released after landing.
  • Release. Surface release devices must be non-pyrotechnic, make little debris and put no more than 300 g of shock into the lander1.
  • Lifting. The LSMS crane has hoist and forklift-tine tools6. Every pallet therefore carries four lifting lugs and two tine pockets, so the C02.2 crane can grab it.

How it maps to each lander

Lander Surface payload Payload power / data Fit
Firefly Blue Ghost up to 240 kg2 over 400 W; DTE or relay2 Plate class on above-deck, interior, inter-deck or below-deck positions2
Astrobotic Griffin 625 kg1 1 W and 10 kbps per kg as standard1 Plate class, native grid; pallet on request
Intuitive Machines Nova-C 130–150 kg3 300–400 W; up to 8 Mbps3 Plate class via per-lander adapter
Blue Moon Mk1 up to 3,000 kg48 not published Pallet class; lander is 8.05 m tall, 3.08 m wide4
Starship / Blue Moon Mk2 cargo ~15 t5 not published Heavy pallet; Starship is 52 m tall, with crew compartment at the top and an elevator5; Mk2 is 16 m5

Sizing

Power and data budgets per kilogram (arithmetic from the figures above):

  • Griffin standard: 1 W/kg, so a 100 kg payload gets 100 W and 100 × 10 = 1,000 kbps.
  • Blue Ghost: 400 W ÷ 240 kg ≈ 1.7 W/kg at full load.
  • Nova-C: 300–400 W ÷ 130–150 kg ≈ 2.0–3.1 W/kg.

Design rule (Open Moon choice): every payload must survive and do its minimum mission on 1 W/kg and 10 kbps/kg, the lowest common level. Extra power and data are bought per mission.

Pallet classes (design choice, ESTIMATE):

Class Payload mass Mount Lifting
Plate up to ~100 kg Adapter plate, M5 on 75 mm grid Hand or crane hook
Pallet ~100 kg – 3 t 4 hard points 4 lugs + tine pockets
Heavy pallet 3 – 15 t 4–8 hard points, set per lander Spreader bar + lander elevator or crane

Testing and qualification

  1. Write the standard. Publish an open interface control document, CAD files and pinouts. Review it with each lander provider.
  2. Fit checks. Build a mass-and-connector dummy for each class and fit-check it at each provider’s integration facility.
  3. Environment tests. Shake, shock and acoustic-test the dummy pallet to the envelope of all landers’ environments (GEVS-style1).
  4. Thermal-vacuum test. Measure the plate’s conductance to confirm it stays below 0.1 W/K. Cycle the dust covers in vacuum and cold.
  5. Crane interface test. Lift dummy pallets with the C02.2 crane’s hoist and tines on Earth.
  6. First flight. The first small payloads (M01, M03) fly on the plate class. The crane’s own delivery tests the pallet class on the Moon.

Open questions

  • Will Blue Origin and SpaceX publish payload user guides for Blue Moon Mk1 and Starship cargo? What hard-point spacing do they use?
  • Is 28 V enough for payloads above 1 kW, or does the heavy pallet need a higher-voltage bus to match M04’s grid?
  • Which Ethernet variant survives lunar thermal cycling best: copper SpaceWire-style links or fibre?
  • Can an existing industry standard (for example a CubeSat-style rail or an ISS-style connector) replace parts of this one?
Problems and solutions · 7
SeverityProblemSolution
HighLander providers do not publish full interface documents; deck layouts and loads arrive late and changeKeep payloads independent of bolt holes by using adapter plates. Sign interface agreements early and fund per-lander adapter drawings.
HighOne standard may not fit both 240 kg small landers and 15 t cargo landersDefine three classes (plate, pallet, heavy pallet) that share the same connector, voltage and data protocols.
HighHeavy landers put cargo high above the ground (Starship is 52 m tall)Put lifting lugs and forklift pockets on every pallet so a lander elevator or the C02.2 crane can handle it.
MediumLaunch and landing loads differ between landers and launch vehiclesQualify each payload to an envelope of all selected landers' environments, using GEVS-style tests.
MediumLanding plume dust coats optics, radiators and connectorsCovers stay closed until after landing and are released only after any nearby landing. Connectors carry dust caps.
MediumPower and data per kilogram differ widely between landersDesign payloads to the lowest common level (1 W/kg, 10 kbps/kg) and buy extra where needed.
MediumA release mechanism fails and the payload is stuck on the deckUse dual-wound non-pyrotechnic release devices, and allow the crane to free a stuck payload by lifting.

Specification

ScopeMechanical, electrical, data, thermal, dust and lifting interfaces
Mechanical (small)Adapter plate onto M5 inserts on a 75 mm grid (matches Astrobotic decks)
Mechanical (medium/heavy)Standard pallet with four hard points, four lifting lugs and forklift pockets (design choice)
Power28 V DC ±5%, two circuits: operations/heaters and actuation
DataRS-422 and SpaceWire, plus Ethernet/IP on the pallet class (design choice); time-at-tone sync
ConnectorMIL-DTL-38999 Series III, regular and small sizes
ThermalPayload isolated from lander, conductance below 0.1 W/K
ReleaseNon-pyrotechnic, shock below 300 g into the lander
Landers coveredBlue Ghost, Griffin, Nova-C, Blue Moon Mk1, Starship and Blue Moon Mk2 cargo
DeliverableOpen interface control document, CAD, connector pinouts and test plan
Technology readiness · TRL 6 / 9

Sources

  1. Astrobotic Lunar Landers Payload User's Guide (Aug 2021)
  2. Firefly: Blue Ghost lunar lander (accessed Nov 2026)
  3. Intuitive Machines and Space Applications Services: lunar delivery services (ESA BSGN) (Feb 2024)
  4. Blue Moon (spacecraft), Wikipedia (accessed Nov 2026)
  5. NASA HLS IAC 2026 presentation (Oct 2026)
  6. NASA: Lightweight crane technology could find a home on the Moon (LSMS) (Feb 2021)
  7. NASA: LunaNet Interoperability Specification v5 (Jan 2025)
  8. Blue Origin: Blue Moon Mark 1 (accessed Nov 2026)
  9. Nokia: Nokia and Intuitive Machines deliver first cellular network to the Moon (Mar 2025)
ProjectOPEN MOON · Self-sustaining lunar colony
DocumentC02.1
Revision1.2 · Draft
EditEdit on GitHub