C04.4 · Component of M04

3 kV AC grid and cable-laying rover

A 3 kV, 3-phase, 1 kHz AC grid, NASA's lunar baseline, that links the reactor, solar towers and storage to the habitat and oxygen plant. Transformers and modular converters connect 120 V DC equipment. A small rover lays and covers the cable.
Sub-components · 7
1

Transmission cable

Three-phase cable carrying power 1–3 km at 3 kV so conductors stay thin.

  • Three aluminium conductors
  • FEP insulation rated with margin for 3 kV in vacuum
  • Outer abrasion-resistant jacket
  • Vacuum-rated HV connectors and splices
  • Cable markers
BASIS: NASA GRC AC cable tests in vacuum with regolith simulant (2025) · TRL 4
2

Transformers

Step 120 V-class inverter output up to 3 kV at each source, and back down at each user. This is the reason NASA chose AC.

  • 1 kHz line-frequency transformers
  • High-voltage AC relay module
  • Thermal path to radiator
  • Insulation for vacuum operation
BASIS: NASA UMIC design; NASA FSP 2025 reference (3 kVac step-up) · TRL 4
3

Universal Modular Interface Converters (UMIC)

Connect 120 V DC equipment and microgrids to the AC grid, in both directions.

  • Standard 1 kW single-phase inverter modules in parallel
  • DC switch modules for fault isolation and current limiting
  • AC output filters and 3-phase relays
  • Ethernet controller
  • Housekeeping power module
BASIS: NASA GRC UMIC (STMD), 1 kW module bench-tested 2023 · TRL 4
4

Switchgear and protection

Isolates faults quickly so one bad cable or load cannot drop the whole grid.

  • High-voltage AC relays and breakers
  • DC switch modules on the 120 V side
  • Current limiting in inverters
  • Insulation monitoring and grounding
  • Surge protection
BASIS: UMIC relay and DC switch modules; terrestrial AC protection practice · TRL 4
5

Microgrids and control

Runs habitat and ISRU as separate local grids that share power over the trunk. With no spinning machines, inverters must hold frequency and voltage themselves.

  • 120 V DC buses and power distribution units
  • Droop control in every UMIC (shares load between parallel units)
  • Regional grid controller
  • Priority load-shedding tables
  • Earth link for remote operation
BASIS: NASA UMIC droop control (simulated and bench tested, 2023) · TRL 4
6

Cable-laying rover

Carries a cable reel from the lander, unreels it along a surveyed route on the surface.

  • Rover chassis and drive
  • Powered reel with tension control
  • Cable guide and payout counter
  • Crossing-protector placer (ramps over cable at rover crossings)
  • Route cameras and lidar
BASIS: Astrobotic LunaGrid-Lite (AC cable demo); NASA FSP utility-rover concept · TRL 5
7

Fault location and monitoring

Finds and locates cable faults without sending a rover to walk the whole line.

  • Time-domain reflectometer at each node
  • Insulation resistance monitor
  • Partial-discharge sensors
  • Current and voltage sensors
  • Fault log to the grid controller
BASIS: Terrestrial TDR practice, to be adapted for lunar use · TRL 4
Engineering notes
Design change · DD-001 Lunar power grid: switch from ±4 kV DC to 3 kV AC, 3-phase, 1 kHz (2026-11-18)

To match NASA's own lunar grid baseline, which NASA chose because DC cannot yet be raised to the needed voltage with radiation-hard parts. This component was first designed as a ±4 kV DC grid, following NASA Glenn's February 2022 transmission review. It was redesigned on 18 November 2026 to NASA's 3 kV AC, 1 kHz baseline.

NASA sources: Feb 2022 · Aug 2022 · Sep 2023 · 2025 · Dec 2025 · Full decision record →

What it does

The grid moves power from where it is made to where it is used. NASA’s reactor reference design places the user interface 1 km from the reactor3, and the oxygen plant needs power over 3–5 km6. NASA’s baseline is two independent microgrids, one for the habitat and one for ISRU, each with its own sources, joined by a primary line so they can share power6.

Why 3 kV AC at 1 kHz: NASA’s reasoning

When What NASA found Source
Feb 2022 Reviewed lunar transmission for 40 kW fission power. High-voltage metal cable is the best option; laid out AC and DC hardware challenges. Explicitly not a NASA preference. Barth & Pike5
Aug 2022 Trade study across 1.2–6 kV, DC and 3-phase AC, 60 Hz to 1 kHz. 1 kHz gave the lowest mass; 3 kV AC was the mass-optimal feasible design. Thomas et al.1
Sep 2023 Published the UMIC, which connects 120 V DC equipment to a 3 kV AC grid at 1 kHz. Thomas et al.2
2025 Government reactor reference design uses a 3 kVac, 1 kHz link to a user 1 km away, selected to leverage UMIC. Mason et al.3
Dec 2025 Tested AC cables in vacuum with regolith simulant: no major losses; frequency did not change results. Klopp et al.4

NASA’s own words on the choice:

“DC grid practically limited to 1.2-1.5 kV, due to lack of high voltage rad-hard switches … AC easier to increase voltage and expand, as transformers can change voltage in AC-DC designs … These facts drove team to select AC.”1

The same study says DC would be “significantly lighter than AC for voltages above 3-4 kV”1. So AC is not the lightest grid in theory. It is the lightest one that can be built with radiation-hard parts that exist.

How it works

  • Transformers do the voltage change. Each source’s inverters make low-voltage AC, and a transformer raises it to 3 kV. At each user a transformer lowers it again2. Transformers need no high-voltage semiconductor switches, which is the problem that rules out high-voltage DC1.
  • UMIC. Built from parallel, standard 1 kW single-phase inverter modules converting between 120 V DC and under 100 V AC, then one or more transformers to 3 kV. DC switch modules isolate DC faults, a high-voltage relay can disconnect the transformer, and an Ethernet controller coordinates the modules2. NASA’s targets are over 85% transmission system efficiency and under 0.55 kg per metre2.
  • Control. Parallel UMICs share load using droop control, adjusting frequency and voltage slightly with load, so no central controller is needed to balance them2. A regional controller sends power to the highest-priority loads first, such as the crewed habitat6.
  • Reactor interface. NASA’s 2025 design couples the Brayton option’s 3-phase alternators straight to the 3 kVac step-up transformer, at about 90% PMAD efficiency. The Stirling option needs an extra converter stage and reaches about 83%3.
  • Cable laying. Astrobotic’s LunaGrid-Lite pairs a 4U CubeRover with a robotic cable deployer. It is planned to carry 1 kW over 500 m7. Earlier plans used 1 km at 1 kV and 1 kHz AC8, the same frequency as NASA’s grid.
  • Lay it on the surface. NASA’s 2025 design keeps the cable on the surface, where it has a 180° view to space for shedding heat. It says “burying the cable is not advised due to the poor thermal conductivity of the regolith”3.
  • Fault location. A time-domain reflectometer sends a pulse down the line and times the echo from any impedance change9.

Sizing

One 40 kW, 3-phase link (this plan’s arithmetic, unity power factor):

Quantity Working Result
Current per phase at 3 kV 40 kW ÷ (√3 × 3 kV) ~7.7 A
Allowed loss (95% cable efficiency) 5% × 40 kW 2 kW
Resistance per conductor, 3 km 2,000 W ÷ (3 × 7.7²) ~11 Ω (3.7 Ω/km)
Aluminium area 26.5 nΩ·m10 ÷ 0.0037 Ω/m ~7 mm²
Aluminium mass, 3 conductors × 3 km 7 mm² × 9 km × 2,699 kg/m³10 ~170 kg
NASA reference, cable + spool 1 km main cable3 325 kg per km

Insulation, jacket and spool, not metal, make up most of the cable mass. NASA’s 325 kg per km is the planning figure: about 1 t for 3 km.

  • Voltage check. NASA found no mass benefit above 3 kVac for a 1 km link, because higher voltage pushed wire sizes below the smallest practical gauge. Dropping to 1 kVac added 570 kg3.

Testing and qualification

  1. Cable samples. Partial-discharge and breakdown tests in vacuum at −173 to +130 °C (the lunar range6), with dust; then flex and abrasion. NASA’s 2025 tests already showed no major losses from simulant, coiled or buried4.
  2. UMIC. Scale from NASA’s single 1 kW module2 to a multi-kilowatt unit with transformers. Run thermal-vacuum and radiation tests.
  3. Hardware-in-the-loop microgrid. Run several UMICs in parallel on simulated sources and loads. Inject load steps and faults and check stability and that only the faulted section trips.
  4. Rover field trials. Lay and recover 1 km of cable on simulant slopes. Measure tension, payout accuracy and how the cable lies on rough ground.
  5. On the Moon. Use LunaGrid-Lite’s flight results7 to set the first route. Energise each link at low voltage first, then 3 kV. Record its TDR signature as a baseline.

Open questions

  • How should surface cables be protected from rover traffic and micrometeoroids, given that NASA advises against burial3?
  • Can solar towers feed the AC grid directly through their own UMICs, and how do many inverter-only sources share control?
  • Will a flight reactor use Brayton (direct 3-phase coupling) or Stirling (extra converter stage)?
  • If radiation-hard high-voltage switches mature, would a DC upgrade be worth revisiting? (See DD-001.)
  • Can aluminium cable later be made on the Moon (M12)?
Problems and solutions · 7
SeverityProblemSolution
HighUMIC is early: NASA has bench-tested a single 1 kW module and simulated parallel units; a full multi-kilowatt UMIC has not been tested in vacuum.Build on NASA's UMIC programme; test parallel modules, transformers and droop control in thermal-vacuum before flight.
HighAn AC grid with no rotating machines must be held stable entirely by inverters.Droop control in every UMIC (NASA's approach); hardware-in-the-loop tests with sudden load steps and faults; keep links short.
HighHigh voltage in vacuum risks partial discharge and arcing, made worse by abrasive dust on insulation.Insulation margin, sealed connectors, and partial-discharge testing in vacuum with dust before flight.
HighCables on the surface can be damaged by rovers, thermal cycling and micrometeoroids, but NASA advises against burying them because regolith conducts heat poorly and the cable needs its view to space to shed heat.Lay cables on the surface along surveyed routes away from traffic; protect only rover crossings with ramps; separate the main feeds to limit common failures; build a ring so every node has two paths.
MediumAC cable is heavier than DC would be at higher voltage (NASA says DC is significantly lighter above 3–4 kV).Accepted trade-off (DD-001): AC uses parts that exist; revisit if radiation-hard high-voltage switches become available.
MediumMuch longer grids may need a lower frequency to avoid stability and propagation problems (NASA).Keep 1 kHz for the base's 1–3 km links; study frequency again before any long-distance expansion.
MediumLaying long cables on rough terrain can snag or overstress the cable; LunaGrid-Lite's demo length dropped from 1 km to 500 m.Survey routes from orbit and by rover first; use 1 km reels with field splices; monitor tension and payout.

Specification

Trunk3 kV AC, 3-phase, 1 kHz (NASA baseline; design change DD-001)
User voltage120 V DC microgrids (NASA space power standard)
Interface converterUMIC: parallel 1 kW inverter modules plus line-frequency transformers
Link length1–3 km per link; ≥3 km laid in M04
Efficiency target>85% transmission system (UMIC target)
Mass target<0.55 kg/m transmission system (UMIC target)
Cable mass325 kg per 1 km main cable and spool (NASA 2025 reference)
Microgrids2 (habitat, ISRU) plus source nodes
Rover1 cable layer, ~1 km reel (~0.33 t) per trip
Fault locationTime-domain reflectometry from each node
Technology readiness · TRL 4 / 9

Sources

  1. Thomas, Granger, Csank & Gardner, NASA GRC: Establishing a Lunar Surface Power Grid (trade study selecting 3 kV AC) (Aug 2022)
  2. Thomas et al., NASA GRC: A Modular AC to DC Interface Converter (UMIC) to Enable Lunar Surface Power Transmission (AIAA ASCEND) (Sep 2023)
  3. Mason et al., NASA/DOE: Key Design Trades for a Near-term Lunar Fission Surface Power System (NETS 2025) (2025)
  4. Klopp, Thomas & Csank, NASA GRC: An Experimental Study of Losses in High Voltage AC Lunar Power Cables (SciTech 2026) (Dec 2025)
  5. Barth & Pike, NASA GRC: Lunar Power Transmission for Fission Surface Power (NETS-2022) (Feb 2022)
  6. Csank & Scott, NASA GRC: Power and Energy for the Lunar Surface (Apr 2022)
  7. Astrobotic: LunaGrid-Lite completes critical design review (2025)
  8. SatNews: Astrobotic's LunaGrid VSAT enters thermal vacuum testing (press) (Jul 2024)
  9. Wikipedia: Time-domain reflectometer (2026)
  10. Wikipedia: Aluminium (2026)