A self-sustaining Moon colony, built in six phases.

Every phase is broken into systems, components and sub-components, each tied to real hardware and its readiness level.

Sample data: layout preview, figures not yet sourced
Phases60 to 5
Systems[x]across all phases
Components[x]with sub-components
Open problems[x]awaiting a solution

Phase timeline // plan progress, not real-world progress

PHASE 0

Precursors

Orbital mapping, site selection, landers.

PHASE 1

Robotic outpost

Power, comms, oxygen from regolith.

PHASE 2

Crewed sorties

Short stays, surface habitat, rovers.

PHASE 3

Permanent base

Year-round crew, shielded habitats.

PHASE 4

Closing loops

Food, water and air recycled locally.

PHASE 5

Self-sustaining

Local manufacturing and growth.

Phase 1 · Robotic outpost // systems and readiness

ComponentBased onTRLPlan status
1.2.1
Fission surface power unit
Kilopower / KRUSTY
Drafting
1.2.2
Vertical solar arrays
[to be sourced]
Drafting
1.3.1
Lunar comms relay
[to be sourced]
Complete
1.4.1
Oxygen from regolith plant
[to be sourced]
Open problems

Gate to Phase 2

  • Continuous power through one full lunar night
  • Comms link to Earth with backup
  • Oxygen produced and stored on site
  • Landing pad built and tested

Top risks

Lunar night, about 14 Earth daysFix: fission base load
Abrasive dust on mechanismsFix: seals, dust shields, pad distance
Landing plume ejectaFix: sintered landing pad